Laserfiche WebLink
1 <br />J <br />2 Aerials for conceptual or preliminary PDs <br />Itemized response to pre -application for conceptual or concurrent applications <br />2 sealed surveys <br />3 sets of floor plans and elevation for commercial or multi -family buildings <br />Written Statement and Photograph of Posted Sign <br />For Final PiaJ'q 9p1v <br />Letter from developer providing timeline for achieving the 75% completion threshold. for the <br />overall subdivision improvement <br />ONE OF THE FOLLOWING SETS OF REQUIRED IMPROVEMENT DOCUMENTS: <br />CONSTRUCTION COMPLETE - BUILT OUT: <br />Certificate of Completion from Public Works or copy of letter to Public Works and Utilities <br />requiring inspection of improvements. <br />IF IMPROVEMENTS ARE DEDICATED TO TIM PUBLIC: <br />Original Engineer's Certified Cost Estimate for Improvements (signed end sealed) <br />Failure to provide information on which opdon is being selected may result in a delay in processing the application. <br />—OR <br />CONSTRUCTION INCOMPLETE BOND OUT: <br />Original Engineer's Certified Cost Estimate for Improvements (signed and sealed; note items to be <br />completed or percent completed at 75% threshold for overall subdivision). <br />Statement that improvements are nearing completion and a certificate of completion will be <br />obtain prior to final plat approval <br />Copies of Documents to be recorded with the final plat: <br />a. Covenants, Deed Restrictions, Bylaws, etc. or Statement <br />There Are None <br />b. Property Owner's Association Articles of Incorporation or <br />statement indicating why recording of POA is NOT required. <br />F:VCamm[nity DevelopmentMAPPLICATIONS\curDev applitations\PDAPP.doc <br />Attachment 1 <br />Revised Aptil 2016 Page 3 of 3 <br />P283 <br />