My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 41 <br />Attachment A <br />efuN DUKE <br />1 ENERGY. <br />SECTION No. IX <br />SECONB•THIRD REVISED SHEET NO. 9.432 <br />CANCELS FIRST-SECOND REVISED SHEET NO. <br />9.432 <br />18.4 The Party claiming Force Majeure shall use its best efforts to cure the cause(s) <br />preventing its performance of this Contract provided, however, the settlement of <br />strikes, lockouts and other labor disputes shall be entirely within the discretion of <br />the affected Party and such Party shall not be required to settle such strikes, <br />lockouts or other labor disputes by acceding to demands which such Partydeems <br />to be unfavorable. <br />18.5 If the RF/QF suffers an occurrence of an event of Force Majeure that reduces the <br />generating capability of the Facility below the Committed Capacity, the RF/QF <br />may, upon notice to DEF temporarily adjust the Committed Capacity as provided <br />in Sections 18.6 and 18.7. Such adjustment shall be effective the first calendar <br />day immediately following DEFs receipt of the notice or such later date as may <br />be specified by the RF/QF. Furthermore, such adjustment shall be the minimum <br />amount necessitated by the event of Force Majeure. <br />18.6 If the Facility is rendered completely inoperative as a result of Force Majeure, the <br />RF/QF shall temporarily set the Committed Capacity equal to 0 kW until such <br />time as the Facility can partially or fully operate at the Committed Capacity that <br />existed prior to the Force Majeure. If the Committed Capacity is 0 kW, DEF shall <br />have no obligation to make Capacity Payments hereunder. <br />18.7 If, at any time during the occurrence of an event of Force Majeure or during its <br />cure, the Facility can partially or fully operate, then the RF/QF shall temporarily <br />set the Committed Capacity at the maximum capability that the Facility can <br />reasonably be expected to operate. <br />18.8 Upon the cessation of the event of Force Majeure or the conclusion of the cure for <br />the event of Force Majeure, the Committed Capacity shall be restored to the <br />Committed Capacity that existed immediately prior to the Force Majeure. <br />Notwithstanding any other provisions of this Contract, upon such cessation or <br />cure, DEF shall have right to require a Committed Capacity Test to demonstrate <br />the Facility's compliance with the requirements of this Section 18.8. Any such <br />Committed Capacity Test required by DEF shall be additional to any Committed <br />Capacity Test under Section 7.34. <br />18.9 During the occurrence of an event of Force Majeure and a reduction in <br />Committed Capacity under Section 18.5 all Monthly Capacity Payments shall <br />reflect, pro rata, the reduction in Committed Capacity, and the Monthly Capacity <br />Payments will continue to be calculated in accordance with the pay -for - <br />performance provisions in Appendix A. <br />ISSUED BY: Javier Portuoedo, Director, Rates a Regulatery Strategy - FL <br />1 EFFECTIVE: duly -19.2974 <br />
The URL can be used to link to this page
Your browser does not support the video tag.