My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/12/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
09/12/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2017 4:00:46 PM
Creation date
10/26/2017 2:45:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/12/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
451
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC -2017 -0336 -PAA -EQ <br />DOCKET NO. 20170072 -EQ <br />PAGE 87 <br />Attachment A <br />WILY. <br />SECTION No. IX <br />WRSTSECOND REVISED SHEET No. 9.700 <br />CANCELS FIRST REVISED SHEET No. 9.700 <br />INTERCONNECTION AGREEMENT <br />INTERCONNECTION ARRANGEMENTS AND COST RESPONSIBILITY <br />1_01.0 Purpose <br />1.1. This Interconnection Agreement ("Agreement") sets forth the terms and conditions <br />pursuant to which ("QF") has agreed to comply with and pay <br />Duke Energy Florida, LLC ("Company") to interconnect with Company's electrical <br />system. -This Agreement provides the procedures for the scheduling of construction for <br />the Company's Interconnection Facilities as well as the cost responsibility of a QF <br />Facility for the payment of Interconnection Costs. This Agreement also provides for <br />operating, testing, and inspection procedures for the safe parallel operation of the <br />Facility with the Company's electrical system. This Agreement applies to QFs directly <br />interconnected with the Company's system and providing all net electrical output for sale <br />to the Company . All requirements contained herein shall apply in addition to and not in <br />lieu of the provisions of the Power Purchase Agreement. <br />2.0 24 -Definitions <br />2.1. 2.1—"Agreement" means this Interconnection Agreement <br />2.2. 2,1—"Company" means Duke Energy Florida, LLC. <br />2.3. 2. -"Company's Interconnection Facilities" means all equipment located on the <br />Company's side of the Point of Delivery, including without limitation, equipment for <br />connection, switching, transmission, distribution, protective relaying and safety <br />ISSUED BY: Javier Pmtrrendo, Director, Rates & Regulatory Strategy - FL <br />EFFECTIVE October14,-3018 <br />
The URL can be used to link to this page
Your browser does not support the video tag.