My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r1 <br />U <br />L <br />ORDER NO. PSC -2017 -0278 -PAA -EQ <br />DOCKET NO. 20170077 -EQ <br />PAGE 32 <br />FLORMA POWER & LIGHT COMPANY <br />(Co ntmad from Sleet No. 10304) <br />. min <br />Sisal Revlsed Sheet No. 10.305 <br />Canals FM Revised Sheet No. 10305 <br />DELIVERY VOLTAGE AMSTMENT <br />Energy payments to a QS within the Company's service territory shall be adjusted according in the delivery voltage by the <br />multiplier provided in Appendix 11. <br />PERFORMANM CRITERIA, <br />Payments for I= Capacity ane conditioned an the QS's ability to maimain the following Performance criteria: <br />A. Capacity Delivery Date <br />The Capacity Delivery Date shell be no later than the projected in swAce daft of the Company; Avoided Univ as detailed <br />in Appendix B. <br />B. Availability and Capacity Factor <br />The Facility's availability and capacity factor are used in the determination of thin capacity payments through a <br />pafompnabased calculation in detailed in Appendix B to the Company's Standard Offer Contract. <br />METERING REOUIREMEM3 <br />A QS within the territory served by the Company shall be required to purchase from the Company hourly renorcift meters to <br />measure de'r energy deliveries to the Company. Energy, purchase, firm a QS outside the territory of the CortWany, shell be <br />measured as the quantities scheduled for interchange in the Company by the unity delivering Fenn Capacity and Renewable <br />Energy to the CRmnpany. <br />For the purpose of this SchedulS the onpeak hour shall be those hour occurring April 1 through October 31 Mondays through <br />Fridays, from 12 noon to 9d00 pro excluding Memorial Day, Independence Day and Leben Day, and November 1 through March <br />31 Mondays through Fridays from 6:00 a.m. to 10:00 am and 6:00 pm to 10:00 p.m. prevailing Easton time excluding <br />Tbehdagivog Day. l3orsmas Day, and New Year Day.. FPL dal( have Oa right to change such On -p a Hour by providing <br />the QS a minimum ofthtrty calc dardaye advance wxinen intim <br />BMUNG OPTIONS <br />A QS, upon catcring into a Standard Offer Contract for the sale of firm capacity and energy or prior to delivery of asavailable <br />energy. my elect to make cid= simultaneous pumbasa from and sales to the Company, or act roles to the Company; provided, <br />however, that no orb arrangement shall cause the QS to seg mort than the Facility's net output. A decision on billing aethads <br />may only be changed I)xben aQS mlliog ssavailabk energy entan into a Standard Offer Contract for the sale offrm capacity <br />and cnpgy; 2) when a Standard Offs Contrast expires or is lawfully term®ated by either the QS or the Compeoy; 3) when de <br />QS is selling as -available energy aid has amt changed billing metbods within the last twelve months; d) when the election to <br />change billing wthods will act connivers: this Tariff orthe waded benveau the QS and the Company. <br />H e QS elects to charge billing methods, such charges shall be subject to the falkrwog: 1) upon at kart thirty days advance <br />written notice to the Company, 2) the installation by the Company, of any additional metering eguipreat reasonably required to <br />effect the change In billing and upon payment by the QS for such metering equipment and its installation; and 3) upon completion <br />and approval by the Company of any alteration(s) m the interconnection reasonably, inquired to effect the change in billing and <br />upon payment by the QS for such ahemrion(s} <br />Paymena due a QS will be nude moru y and annually by the twemieth business day followirgtheend of de billing period. The <br />kilowanfiam , sold by the QS and the applicable avoided energy rtes a which payments are being made shall apmrngany the <br />paymcan to de QS. <br />A satri crit covering the changes and payments due the QS Is re dered monthly, and payment normally is made by the twentieth <br />business day following the endofthe bllmg period <br />(Cautioned an Sheet No. 10.306) <br />Issued by: S. E. Roredg, Director, Ratti and Tariffs <br />Effecdver 41tw 25s 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.