My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />9 <br />• <br />• <br />r� <br />ORDER NO. PSC -2017 -0283 -TRF -E1 <br />DOCKET NO. 20170069-E] <br />PAGE 7 <br />j•9 DUKE <br />ENERGY. <br />(2) Canin'bution by Applicant <br />(a) Schedule of Charges: <br />Attachment A <br />Page 1 of 4 <br />SECRON NO. IV <br />iIG14[LGGW{y)NF REVISER SNEETNO.atu <br />CANCELS SEVMDEEt✓�EIGHTEENTH REVISED SHEET NO- 4.113 <br />Company standard designunderground residential drs}rbubw 12D240 volt single-phase service (see <br />also Part 11.03(7)): <br />To subdivisions with a density of 1.0 or more <br />but less than suc(5) dwelfng units per acre- ................... ...... ..... _... $78gP�A0 perdweling unit <br />To subdivisions with a denary of six(8)or more __ <br />dwelling units per am ... .................... .... ._.......................................... _S4f-MU0 per dwelfmg and <br />To subdivisions with a density of <br />six (8) or more dwelling units par acre taking service <br />at ganged meter pedestals ........................................................... U"15BA0 per dwedag umt <br />To rrx/ti-occupancy buildings ....._.___._---- - ... .......... ...... ___............... See Pan 11.08(2) <br />(b) The above costs are based upon arrangements Brat will permit serving the local underground <br />distribution system within the subdivision from overhead feeder rains. If feeder mains within the <br />subdivision are deemed necessary by the Company to provide andfor maintain adequate service <br />and are required by Bre Applicard or a governmental agency to be installed underground, the <br />Applicant shall pay the Company the average differential cost between such underground feeder <br />matin withm the subdivision and equivalent overhead feeder mains as tallows: <br />Three-phase primary main or feeder lunge per trench -foot within subdivision: <br />(U.G. - Underground, O.H. - Overhead) <br />#IfDAWG U.G. vs. #V0 AWG O.H...... ..... ...... ......... ....... _.- ............... S24C3.02w fad <br />500 MCM U.G. vs. 338 MCM O.H........ ................................ - .......... _ Sl l.4?¢�per foot <br />1808 MCM U.G. vs. 705 MCM CA- --------- __.._......... .... _.... ................. 312AII55per foot <br />The above costs are based on underground feeder construction using the direct burial method. If <br />conduit is required. the follovnrg additional durge(s)win apply. <br />2 inch wmdud......................... .......................................... <br />..................... S 43, -,-toper foot <br />d inch conduit _...._._........................................_........_.._........_.._._.....35.253.-�erfoot <br />6 inch condud........ ................ _............. ..... ._..................... <br />................. Si.:Cv_6rfood <br />Cable pulling - single phase... .... _._.........._._................................. <br />�rfooi <br />_... SLGi 7.7 <br />Cable pulling -3 phase small vrim............... _....._.................................SL.4Z;.76perfooi <br />Cade pulling -3 phasefeeder .............. --- ....... <br />.__............................ S2GC22�r foot <br />The above costs do not require the use of pad-rtoumed svntcgear(sj terminal pole(s), pull boxes or <br />feeder spices. If such faaTiBes are required. a differential cost for same will be determined by the <br />Company on an individual basis and added to charges determined above. <br />(c) � (� t ..mead rat pedes trendring5and badddling for the usal costs" stalled above) e be of thelo or vnhere, ac mutual <br />rg C e company's <br />y's facilities in <br />lea i a portion of the cash payment described above. These credits, basad on She Companys design <br />drawings. are: <br />Primary anNcv Secondary SWems, <br />for each Fad of Trench. ..... .......... ................................................. <br />S2 -8g }, <br />Service Laterals. <br />foreacli FoctofTie cl-...._........ .......... _.... .......... _............ _.... _....... _.._52-0gj,$}, <br />ISSUED BY: Javier J. Portuordo, Dkeetor, Rates 8 Regulatory Strategy -FL <br />EFFECTIVE wtyu,,wi <br />(Continued an Ned Page) <br />
The URL can be used to link to this page
Your browser does not support the video tag.