My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/15/2017 (3)
CBCC
>
Meetings
>
2010's
>
2017
>
08/15/2017 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 2:52:19 PM
Creation date
10/26/2017 3:25:19 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
08/15/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
821
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gifford site cleared of 7,000 tires, 250k pounds of debris - VeroNews: Indian River Count... Page 2 of 2 <br />County Environmental specialist Charles Vogt, who monitored the cleanup for the County, said <br />the problems at the site and the amount of debris turned out to be much greater than what was <br />thought in June. <br />He said Paladin dealt with each fresh discovery of more buried waste and dangerous materials <br />quickly and effectively. In the end, more than 7,000 tires and 250,000 pounds of debris were <br />hauled away and disposed of in accordance with environmental regulations. <br />"It is not very often that I gel to thank someone in my job, but I offer my wholehearted thanks to <br />Joe Paladin for the job he and his people did," Vogt told the board. "Every day was like <br />Christmas, going out there and seeing things get done." <br />Paladin said he had 20 to 25 men working for approximately 60 days between mid-June and mid- <br />August; including truck drivers, heavy equipment operators and a fulltime environmental engineer <br />to tell crews how to dispose of hazardous items such as high pressure gas tanks and illegal septic <br />tanks. <br />He said the job has cost $80,000 so far and will probably top out at $100,000. <br />Vogt and Paladin showed photos of the cleared site, which will be seeded and maintained as a <br />grassy lot for the foreseeable future. Paladin has a radar scanning contractor coming to scan the <br />property to see if there is additional material underground that needs to be removed. He is waiting <br />to seed the lot until that survey and any needed excavation are complete. <br />Even though it took Paladin more than 45 days to complete the project, the board waived the <br />$500 -per -day penalty and reduced the $42,500 fine to $15,000. <br />"I was appalled at the conditions that existed in the community [when I saw that site]," said Glade, <br />"and 1 ant overwhelmed by the success of Mr. Paladin and his people in getting it cleaned up." <br />"Ile did a very good job and took care of everything that came up," said board member Patrick <br />Walther. who made the motion to reduce the fine. <br />Paladin called the proiect a joint effort, citing strong support from the Gifford community and <br />expert assistance form county staff as essential to its success. <br />http://wti-A-.veronews.conl/news/indian_river_county/spotl ighilgifford-si te-cleared-of-tires-... 4/7/2016 <br />P15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.