Laserfiche WebLink
ARTICLE 2 ENGINEER <br /> The Collier Creek Estates Phases 1, 1 A,1 B, 2 and Harbor Point Phase 3 Water Assessment project has <br /> been designed by John Boyer, P.E., hereinafter called ENGINEER, and who is to act as OWNER'S <br /> representative, assume all duties and responsibilities and have the rights and authority assigned to <br /> ENGINEER in the Contract Documents in connection with completion of the work in accordance with the <br /> Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 30 calendar days from effective date of Notice to Proceed, CONTRACTOR shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be utilized <br /> on the job. <br /> 3. Perform all photographic recording and documentation of conditions prior to <br /> construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings. <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> (b) From 31 calendar days to 210 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br /> Completion. <br /> (c) From 211 calendar days to 240 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. • <br /> 3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br /> Completion. <br /> 00530-2 <br /> Addendum 1 <br /> J <br />