My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-144A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-144A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2017 10:02:39 AM
Creation date
10/31/2017 10:02:37 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/03/2017
Control Number
2017-144A
Agenda Item Number
8.N.
Entity Name
Timothy Rose Contracting, Inc.
Subject
Construction of water system and utility improvements
Area
Collier Creek Estates and Harbor Point Subdivision
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARTICLE 2 ENGINEER <br /> The Collier Creek Estates Phases 1, 1 A,1 B, 2 and Harbor Point Phase 3 Water Assessment project has <br /> been designed by John Boyer, P.E., hereinafter called ENGINEER, and who is to act as OWNER'S <br /> representative, assume all duties and responsibilities and have the rights and authority assigned to <br /> ENGINEER in the Contract Documents in connection with completion of the work in accordance with the <br /> Contract Documents. <br /> ARTICLE 3 CONTRACT TIME <br /> 3.1 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 30 calendar days from effective date of Notice to Proceed, CONTRACTOR shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be utilized <br /> on the job. <br /> 3. Perform all photographic recording and documentation of conditions prior to <br /> construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Submit and secure approval of shop drawings. <br /> 6. Mobilize all labor, equipment, and materials. <br /> 7. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> (b) From 31 calendar days to 210 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Install all pipe and appurtenant items. <br /> 2. Perform all testing. <br /> 3. Restore all disturbed areas to their pre-construction condition. <br /> 4. Correct all deficiencies noted by Engineer. <br /> Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes Substantial <br /> Completion. <br /> (c) From 211 calendar days to 240 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. • <br /> 3.2 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute Final <br /> Completion. <br /> 00530-2 <br /> Addendum 1 <br /> J <br />
The URL can be used to link to this page
Your browser does not support the video tag.