Laserfiche WebLink
ARTICLE 6 INTEREST <br /> Not Applicable. <br /> ARTICLE 7 CONTRACTOR'S REPRESENTATIONS <br /> In order to induce OWNER to enter into this Agreement, CONTRACTOR makes the following <br /> representations: <br /> 7.1 CONTRACTOR has familiarized itself with the nature and extent of the Contract Documents, <br /> work, site, locality, and all local conditions and laws and regulations that in any manner may affect <br /> cost, progress, performance or furnishing of the work. <br /> 7.2 CONTRACTOR has studied carefully all reports of explorations and tests of subsurface conditions <br /> and drawings of physical conditions which are identified in the Supplementary Conditions as <br /> provided in Paragraph 4.02 of the General Conditions, and accepts the determination set forth in <br /> Paragraph SC-4.02 of the Supplementary Conditions of the extent of the technical data contained <br /> in such reports and drawings upon which CONTRACTOR is entitled to rely. <br /> 7.3 CONTRACTOR has obtained and carefully studied (or assumes responsibility for obtaining and <br /> carefully studying) all such examinations, investigations, explorations, tests, reports and studies <br /> (in addition to or to supplement those referred to in Paragraph 7.2 above) which pertain to the <br /> subsurface or physical conditions at or contiguous to the site or otherwise may affect the cost, <br /> progress, performance or furnishing of the work as CONTRACTOR considers necessary for the <br /> performance of furnishing of the work at the Contract Price, within the Contract Time and in <br /> accordance with the other terms and conditions of the Contract Documents, including specifically <br /> the provisions of Paragraph 4.02 of the General Conditions; and no additional examinations, <br /> investigations, explorations, tests, reports, studies or similar information or data are or will be <br /> required by CONTRACTOR for such purposes. <br /> 7.4 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br /> Contract Documents with respect to existing underground facilities at or contiguous to the site and <br /> assumes responsibility for the accurate location of said underground facilities. No additional <br /> examinations, investigations, explorations, tests, reports, studies or similar information or data in <br /> respect of said underground facilities are or will be required by CONTRACTOR in order to perform <br /> and furnish the work at the Contract Price, within the Contract Time and in accordance with the <br /> other terms and conditions of the Contract Documents, including specifically the provisions of <br /> Paragraph 4.04 of the General Conditions. <br /> 7.5 CONTRACTOR has correlated the results of all such observations, examinations, investigations, <br /> explorations, tests, reports and studies with the terms and conditions of the Contract Documents. <br /> 7.6 CONTRACTOR has given ENGINEER written notice of all conflicts, errors or discrepancies that <br /> he has discovered in the Contract Documents and the written resolution thereof by ENGINEER is <br /> acceptable to CONTRACTOR. <br /> 00530-5 <br /> Addendum 1 <br />