My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/2017
CBCC
>
Meetings
>
2010's
>
2017
>
10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 2:54:40 PM
Creation date
11/1/2017 2:41:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/10/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
G. K. ENVIRONMENTAL,' INC. <br />Environmental Consulting <br />GEORGE R. KULCZYCKI, CEC, CES, CEI <br />155 McKee Lane <br />Vero Beach, FL 32960 <br />Phone 772-567-9129 <br />Emaildme.als>n <br />G. K. Environmental, Inc. Fee Schedule & GKE Subcontractor Fee Schedule <br />• 10/1/17-9/30/19 <br />G. K. Environmental, Inc. Fee Schedule <br />President, Principal Ecologist <br />Administrative Assistance <br />GKE boat / fuel / associated sampling water sampling equipment <br />$150.00 / hour (or lump sum) <br />$ 55.00 / hour (or lump. sum) <br />$ 95.00 / hour (or lump sum) <br />J <br />Phase I Audits / Environmental Site Assessments ... GKE Standard Fee: <br />(includes historic aerial site reviews / onsite inspections, $3,485.00 (<5.0 acre site) <br />and evaluations of: hazardous waste, preliminary endangered & <br />threatened species, and approximate wetland locations) <br />GKE reimbursement expenses photo b/w copies $0.15; <br />photo color copies $0.45; <br />postage: per postage invoice <br />Travel No Cost in IRCo / $0.50 mile <br />outside IRCo <br />G. K. Environmental, Inc. Subcontractor Coordination and Supervision Services Fee Schedule <br />Certified Gopher Tortoise Surveys <br />Landscape & Maintenance Service <br />Archaeological Service <br />CAD Operator <br />Field Assistant I. <br />Field sistant : iologist / hemist <br />ologist <br />$130.00 / hour. or 10% per <br />proposal <br />10% per proposal <br />10% per proposal <br />$ 95.00 per hour <br />$ 60.00 per hour <br />90.00 per hour <br />a X17 <br />Date <br />P99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.