My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/10/2017
CBCC
>
Meetings
>
2010's
>
2017
>
10/10/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 2:54:40 PM
Creation date
11/1/2017 2:41:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/10/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ECOLOGICAL ASSOCIATES, INC. <br />RATE AND FEE SCHEDULE FOR INDIAN RIVER COUNTY <br />Effective Dates: October 1, 2017 — September 30, 2019 <br />1) Personnel (Hourly Rates, Inclusive of Overhead and Profit): <br />Professional Title Rate <br />Principal (President/Scientific Director) <br />Project Manager <br />Senior Scientist II <br />Senior Scientist I/Gopher Tortoise Specialist <br />Biologist II <br />Biologist I <br />Lab/Field Technician <br />Associate Scientist (Specialist) <br />Scientific Diver <br />$130.00 <br />$115.00 <br />$105.00 <br />$95.00 <br />$90.00 <br />$80.00 <br />$55.00 <br />$150.00 <br />$195.00 <br />2) Equipment Usage Fees: <br />Boat Fees: <br />16-20ft EAI vessel - $450/day (operations exclusive of crew) <br />21-25ft EAI vessel - $720/day (operations exclusive of crew) <br />Leased Vessel — Cost plus $160/day (insurance coverage and operations) <br />Kayak - $55/day (exclusive of crew) <br />Diving Operations (gear, safety plan, and operational expenses, excluding <br />personnel) - $160/person/day <br />Precision GPS (sub -meter accuracy) - $265/day <br />ATV and trailer - $80/day <br />Water quality meter - $135/day <br />Other Equipment Usage Fees — Quoted on project -specific basis <br />3) Travel: <br />Mileage (Applicable GSA mileage rate) <br />Per diem (Quoted on project -specific basis): <br />$ 0.535/mile (current) <br />Cost <br />4) Dircct Expenses: Cost <br />5) Sub -contractors: Cost Plus 8.5% <br />Authorized by: <br />to <br />CEO <br />eForest Date <br />P73 <br />
The URL can be used to link to this page
Your browser does not support the video tag.