My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-164A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-164A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2020 9:55:44 AM
Creation date
11/20/2017 1:59:16 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/24/2017
Control Number
2017-164A
Agenda Item Number
8.D.
Entity Name
Southern Management, LLC
Subject
Annual Maintenance
Area
Spoonbill Marsh
Project Number
1300 57th Street
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. CONTRACTOR shall use a per foot price. <br />ITEM NO. 11 NORTH AND SOUTH BREECH DEBRIS REMOVAL <br />11.1 Summary <br />1. North and South Breeches are discharge water channels connecting ponds to the <br />Lagoon. Depth 1 to 4 feet. <br />2. CONTRACTOR shall furnish all labor, equipment and incidentals required to remove <br />debris from the North and South Breeches (each bank): <br />3. The breech locations are shown in Drawing 11. <br />11.2 Frequency and Conditions <br />1. CONTRACTOR shall.clean the North and South Breeches quarterly, four (4) times per <br />year, once in March, June, September and December. If weather conditions prevent <br />scheduled cleaning, cleaning will be rescheduled per the COUNTY. <br />2. COUNTY may require additional cleaning of debris from the north and south breech <br />after storm events and will provide the CONTRACTOR written notice 7 calendar days in <br />advance. <br />3. Debris consist of decomposing vegetation and silt, overhanging canopy of mangrove <br />trees impeding flow, fallen tree limbs and some tree roots. <br />4. CONTRACTOR shall be working in water. <br />S. CONTRACTOR shall place debris on each bank.well away from water channel. Debris is <br />not required to be removed from site. <br />ITEM NO. 12 ROAD MAINTENANCE <br />12.1 • Summary <br />1. CONTRACTOR shall furnish all labor, equipment and incidentals required for.repairing <br />and maintaining roads. <br />2. CONTRACTOR shall furnish suitable roadway material as approved by the COUNTY. <br />3. Roads shown in Drawing 12. <br />12.2 Frequency and Conditions <br />1. Once each year in•December, CONTRACTOR shall repair roads. If weather conditions <br />prevent scheduled road repairs, road repairs will be rescheduled per the County. <br />2. CONTRACTOR shall begin road maintenancestarting at the end of pavement nearest US <br />Highway 1. <br />3:. COUNTY may require additional site work or road repair due to weather related erosion <br />or other unforeseen events and will provide the CONTRACTOR written notice 7 calendar <br />days in advance. <br />Exhibit 1— Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.