Laserfiche WebLink
6. CONTRACTOR shall use a per foot price. <br />ITEM NO. 11 NORTH AND SOUTH BREECH DEBRIS REMOVAL <br />11.1 Summary <br />1. North and South Breeches are discharge water channels connecting ponds to the <br />Lagoon. Depth 1 to 4 feet. <br />2. CONTRACTOR shall furnish all labor, equipment and incidentals required to remove <br />debris from the North and South Breeches (each bank): <br />3. The breech locations are shown in Drawing 11. <br />11.2 Frequency and Conditions <br />1. CONTRACTOR shall.clean the North and South Breeches quarterly, four (4) times per <br />year, once in March, June, September and December. If weather conditions prevent <br />scheduled cleaning, cleaning will be rescheduled per the COUNTY. <br />2. COUNTY may require additional cleaning of debris from the north and south breech <br />after storm events and will provide the CONTRACTOR written notice 7 calendar days in <br />advance. <br />3. Debris consist of decomposing vegetation and silt, overhanging canopy of mangrove <br />trees impeding flow, fallen tree limbs and some tree roots. <br />4. CONTRACTOR shall be working in water. <br />S. CONTRACTOR shall place debris on each bank.well away from water channel. Debris is <br />not required to be removed from site. <br />ITEM NO. 12 ROAD MAINTENANCE <br />12.1 • Summary <br />1. CONTRACTOR shall furnish all labor, equipment and incidentals required for.repairing <br />and maintaining roads. <br />2. CONTRACTOR shall furnish suitable roadway material as approved by the COUNTY. <br />3. Roads shown in Drawing 12. <br />12.2 Frequency and Conditions <br />1. Once each year in•December, CONTRACTOR shall repair roads. If weather conditions <br />prevent scheduled road repairs, road repairs will be rescheduled per the County. <br />2. CONTRACTOR shall begin road maintenancestarting at the end of pavement nearest US <br />Highway 1. <br />3:. COUNTY may require additional site work or road repair due to weather related erosion <br />or other unforeseen events and will provide the CONTRACTOR written notice 7 calendar <br />days in advance. <br />Exhibit 1— Page 7 <br />