My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-159A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 2:21:01 PM
Creation date
11/20/2017 2:35:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/17/2017
Control Number
2017-159A
Agenda Item Number
8.H.
Entity Name
Public Works Engineering Division
Subject
Intersection and signalization improvements
Area
27th Avenue at 21st Street SW
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and responsibility set forth in paragraph 9.10, and <br />particularly, but without limitation, during or as a result <br />of ENGINEER's visits or observations of <br />CONTRACTOR's Work ENGINEER will not <br />supervise, direct, control, or have authority over or be <br />responsible for CONTRACTOR's means, methods, <br />techniques, sequences, or procedures of construction, <br />or the safety precautions and programs incident <br />thereto, or for any failure of CONTRACTOR to comply <br />with Laws and Regulations applicable to the <br />performance of the Work. <br />9.03 Project Representative <br />A. If OWNER and ENGINEER agree, ENGI- <br />NEER will furnish a Resident Project Representative <br />to assist ENGINEER in providing more extensive <br />observation of the Work. The responsibilities and <br />authority and limitations thereon of any such Resident <br />Project Representative and assistants will be as <br />provided in paragraph 9.10 and in the Supplementary <br />Conditions. If OWNER designates another represen- <br />tative or agent to represent OWNER at the Site who is <br />not ENGINEER's Consultant, agent or employee, the <br />responsibilities and authority and limitations thereon of <br />such other individual or entity will be as provided in the <br />Supplementary Conditions, <br />9.04 Clarifications and Interpretations <br />A. ENGINEER will issue with reasonable <br />promptness such written clarifications or interpreta- <br />tions of the requirements of the Contract Documents <br />as ENGINEER may determine necessary, which shall <br />be consistent with the intent of and reasonably <br />inferable from the Contract Documents. Such written <br />clarifications and interpretations will be binding on <br />OWNER and CONTRACTOR. If OWNER and CON- <br />TRACTOR are unable to agree on entitlement to or on <br />the amount or extent, if any, of any adjustment in the <br />Contract Price or Contract Times, or both, that should <br />be allowed as a result of a written clarification or <br />interpretation, a Claim may be made therefor as <br />provided in paragraph 10.05. <br />9.05 Authorized Variations.in Work <br />A. ENGINEER may authorize minor variations in <br />the Work from the requirements of the Contract <br />Documents which do not involve an adjustment in the <br />Contract Price or the Contract Times and are compati- <br />ble. with the design concept of the completed Project <br />as a functioning whole as indicated by the Contract <br />Documents. These may be accomplished by a Field <br />Order and will be binding on OWNER and also on <br />CONTRACTOR, who shall perform the Work involved <br />promptly. If OWNER and CONTRACTOR are unable <br />to agree on entitlement to or on the amount or extent, <br />if any, of any adjustment in the Contract Price or <br />Contract Times, or both, as a result of a Field Order, <br />a Claim may be made therefor as provided in <br />paragraph 10.05. <br />9.06 Rejecting Defective Work <br />A. ENGINEER will have authority to disapprove <br />or reject Work which ENGINEER believes to be <br />defective, or that ENGINEER believes will not produce <br />a completed Project that conforms to the Contract <br />Documents or that will prejudice the integrity of the <br />design concept of the completed Project as a <br />functioning . whole as indicated by the Contract <br />Documents. ENGINEER will also have authority to <br />require special inspection or testing of the Work as <br />provided in paragraph 13.04, whether or not the Work <br />is fabricated, installed, or completed. <br />9.07 Shop Drawings, Change Orders and <br />Payments <br />A. In connection with. ENGINEER's authority as <br />to Shop Drawings and Samples, see paragraph 6.17. <br />B. In connection with ENGINEER's authority as <br />to Change Orders, see Articles 10, 11, and 12. <br />C. In connection with ENGINEER's authority as <br />to Applications for Payment, see Article 14. <br />9.08 Determinations for Unit Price Work <br />A. ENGINEER will determine the actual quanti- <br />ties and classifications of Unit Price Work performed <br />by CONTRACTOR. ENGINEER will review with <br />CONTRACTOR the ENGINEER's preliminary <br />determinations on such matters before rendering a <br />written decision thereon (by recommendation of an <br />Application for Payment or otherwise). ENGINEER's <br />written decision thereon will be final and binding <br />(except as modified by ENGINEER to reflect changed <br />factual conditions or more accurate data) upon <br />OWNER and CONTRACTOR, subject . to the <br />provisions of paragraph 10.05. <br />9.09 Decisions on Requirements of Contract <br />Documents and Acceptability of Work <br />A. ENGINEER will be the initial interpreter of the <br />requirements of the Contract Documents and judge of <br />the acceptability of the Work thereunder. Claims, <br />disputes and other matters relating to the acceptability <br />of the Work, the quantities and classifications of Unit <br />Price Work, the interpretation of the. requirements of <br />the Contract Documents pertaining to the <br />00700 - General Conditions REV 5-10-13 <br />00700-29 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1643 27th Avenue at 21st Street SW Intersection_Signalization Improvements\1-Admin\Bid Documents\Master contract <br />Documents100700 - General Conditions REV 5-10-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.