My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-159A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 2:21:01 PM
Creation date
11/20/2017 2:35:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/17/2017
Control Number
2017-159A
Agenda Item Number
8.H.
Entity Name
Public Works Engineering Division
Subject
Intersection and signalization improvements
Area
27th Avenue at 21st Street SW
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00800 - SUPPLEMENTARY CONDITIONS <br />TO THE GENERAL CONDITIONS <br />Article Title <br />Article Number <br />Introduction <br />SC — <br />1.00 <br />Defined Terms <br />SC — <br />1.01 <br />Terminology <br />SC — <br />1.02 <br />Before Starting Construction <br />SC — 2.05 <br />Preconstruction Conference <br />SC — <br />2.06 <br />Coordination of Plans, Specifications, and Special Provisions <br />SC — <br />3.06 <br />Subsurface and Physical Conditions <br />SC — <br />4.02 <br />Performance, Payment and Other Bonds <br />SC — <br />5.01 <br />Certificates of Insurance <br />SC — <br />5.03 <br />CONTRACTOR'S Liability Insurance <br />SC — 5.04 <br />OWNER's Liability Insurance <br />SC — <br />5.05 <br />Property Insurance <br />SC — <br />5.06 <br />Waiver of Rights <br />SC — <br />5.07 <br />Receipt and Application of Insurance Proceeds <br />SC = <br />5.08 <br />Acceptance of Bonds and Insurance; Option to Replace <br />SC — <br />5.09 <br />Labor; Working Hours . <br />SC — <br />6.02 <br />Concerning Subcontractors, Suppliers and Others <br />SC — <br />6.06 <br />Permits <br />SC <br />— 6.08 <br />Cost of the Work <br />SC <br />— 11.01 <br />Test and Inspections <br />SC — 13.03 <br />OWNER May Stop the Work <br />SC <br />— 13.05 <br />Correction Period <br />SC — 13.07 <br />Progress Payments <br />SC <br />— 14.02 <br />Substantial Completion <br />SC <br />— 14.04 <br />00800-i <br />00800 - Supplementary Conditions 05-13 rev <br />00800 IF:\Public Works\ENGINEERING DIVISION PROJECTS\1643 27th Avenue at 21st Street SW Intersection_Signalization Improvements\t-Admin\Bid <br />Documents\Master Contract Documents\00800 - Supplementary Conditions 05-13 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.