My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-159A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 2:21:01 PM
Creation date
11/20/2017 2:35:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/17/2017
Control Number
2017-159A
Agenda Item Number
8.H.
Entity Name
Public Works Engineering Division
Subject
Intersection and signalization improvements
Area
27th Avenue at 21st Street SW
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.02 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with <br />OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that <br />there was a material and substantial mistake in the preparation of its Bid, that Bidder may <br />withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder <br />will be disqualified from further bidding on the Work. <br />ARTICLE 17 - OPENING OF BIDS <br />17.01 Bids will be opened at the time and place indicated in the advertisement or invitation to Bid <br />and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the <br />base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids. <br />ARTICLE 18 - BIDS TO REMAIN SUBJECT TO ACCEPTANCE <br />18.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but <br />OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of <br />this period. <br />ARTICLE 19 - AWARD OF CONTRACT <br />19.01 OWNER reserves the right to reject any or all Bids, including without limitation, <br />nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER further reserves the <br />right to reject the Bid of any Bidder whom it finds, after reasonable inquiry and evaluation, to be <br />non -responsible. OWNER may also reject the Bid of any Bidder if OWNER believes that it would <br />not be in the best interest of the Project to make an award to that Bidder. OWNER also reserves <br />the right to waive all informalities not involving price, time, or changes in the Work and to <br />negotiate contract terms with the Successful Bidder. The County will not reimburse any Bidder for <br />bid preparation costs. Owner reserves the right to cancel the award of any Contract at any time <br />before the execution of such Contract by all parties without any liability to the Owner. For and in <br />consideration of the Owner considering Bids submitted, the Bidder, by submitting its Bid, <br />expressly waives any claim to damages, of any kind whatsoever, in the event the Owner exercises <br />its right to cancel the award in accordance herewith. <br />19.02 More than one Bid for the same Work from ar individual or entity under the same or <br />different names will not be considered. Reasonable grounds for believing that any Bidder.has an <br />interest in more than one Bid for the Work may be cause for disqualification of that Bidder and the <br />rejection of all Bids in which that Bidder has an interest. <br />19.03 In evaluating Bids, OWNER will consider whether or not the Bids comply with the <br />prescribed requirements, and such alternates, unit prices and other data, as,may be requested in <br />the Bid Form or prior to the Notice of Award. It is the OWNER's intent to accept alternates (if any <br />are accepted) in the order in which they are listed on the Bid form, but OWNER may accept them <br />in any order or combination. <br />19.04 In evaluating Bidders, OWNER will consider the qualifications of Bidders and may <br />consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or <br />entities proposed for those portions of the Work for which the identity of Subcontractors, <br />00200 - Instructions to Bidders REV 04-07 <br />00200-9 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\164327th Avenue at 21st Street SW tntersection_Signalization Improvements\1-Admin\Bid Documents\Master <br />Contract Documents\00200 - Instructions to Bidders REV 04-07.doc Rev. 05/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.