My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-159A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-159A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2020 2:21:01 PM
Creation date
11/20/2017 2:35:03 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/17/2017
Control Number
2017-159A
Agenda Item Number
8.H.
Entity Name
Public Works Engineering Division
Subject
Intersection and signalization improvements
Area
27th Avenue at 21st Street SW
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />Bel <br />DATE OF ISSUANCE: <br />EFFECTIVE DATE: <br />OWNER: Indian River County <br />CONTRACTOR: <br />Project: 27TH AVENUE AT 21sT STREET SW INTERSECTION/SIGNALIZATION <br />IMPROVEMENTS <br />OWNER's Project No. IRC -1643 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Purpose of Work Change Directive: <br />Attachments: (List documents supporting change) <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />R Unit Prices <br />II Lump Sum <br />II Other: <br />II By Change Order: <br />Method of determining change in <br />Contract Times <br />[1 Contractor's Records <br />❑ Engineer's Records <br />II Other: <br />II By Change Order: <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$ Substantial Completion: days; <br />Ready for Final Completion: days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />By: <br />By: <br />CONTRACTOR (Signature) <br />ENGINEER (Signature) <br />OWNER (Signature) <br />Date: <br />Date. <br />Date: <br />* * END OF SECTION * * <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1643 27th Avenue at 21st Street SW Intersection_Signalization <br />Improvements\1-Admin\Bid Documents\Master Contract Documents\00948 - Work Change Directive Rev 06-2013.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.