Laserfiche WebLink
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and Traffic Control Devices Inc. <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth. <br />agree as follows: <br />ARTICLE 1 -WORK <br />1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br />Documents. The Work is generally described as follows: <br />The project will consist of intersection and signalization improvements at 27th <br />Avenue and 21S1 Street SW. The proposed improvements consist of the installation of <br />mast arm traffic signals, milling and resurfacing at the intersection, pedestrian <br />crosswalks and curb ramps, including sidewalk ramps and landings, associated signage <br />and pavement markings. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br />part is generally described as follows: <br />Project Name: 27TH AVENUE AT 21ST STREET SW <br />INTERSECTION/SIGNALIZATION IMPROVEMENTS <br />County Project Number: IRC -1643 <br />Bid Number: 2017063 <br />Project Address: 27TH AVE. AT 21ST ST. SW, VERO BEACH, FL. <br />ARTICLE 3 — ENGINEER <br />3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br />and will act as OWNER's representative, assume all duties and responsibilities, and have <br />the rights and authority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />00520 - Agreement (Public Works) REV 06-14 <br />00520-2 <br />F:APurchasingV6ids12016-2017 FY (2017000)12017063 27th Avenue at 21st St SM00520 -Agreement (Public Works) REV 06-14.doc <br />