My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/29/1992
CBCC
>
Meetings
>
1990's
>
1992
>
9/29/1992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:03:33 PM
Creation date
6/16/2015 11:19:40 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
09/29/1992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
/ �FP 2 9199 <br />e Family: <br />took 8 7 eAu 73 <br />TABLE 3.A.16 <br />AND 3.3.19 <br />WATER i WASTEWATER CONNECTION MATRIX <br />FOR A NEW DEVELOPMENT <br />ithin 200' of system <br />utside of 200' of system <br />esiaentiai Fro3ects: <br />ubdivision, multi -family <br />ite plan, PD, DRI <br />ithin I mi. of the system <br />25 units or more <br />Less than 25 units <br />INSIDE OF THE URBAN <br />--------------------------------------------------------------- <br />utside of J mi. of system <br />25 units or more X <br />Less than 25 units I X** <br />on -Residential Projects: <br />Subdivision, Site plan, PD, DRI <br />Within J mi. of system <br />21000 gallons daily flow <br />or more * <br />Less than 2,000 gallons <br />daily flow * <br />--------------------------------------------------------------- <br />utside of J mi. of system I <br />2,000 gallons daily flow <br />or more * X <br />Less than 2,000 gallons <br />daily flow * X** <br />y flow refers to water consumption or sewer generat <br />**The applicant for any development project, where such project <br />will not connect to a centralized system, must sign a developer's <br />agreement with they Indian River County Utilities Department to <br />operate on a private system with a commitment to connect to the <br />regional 8YOtsmi *Uft Service is available. These agreements shall <br />be conditiondd U06h demonstration of compliance with applicable <br />federal, 8t&t-6# efid local permit requirements. When using a <br />private syet at apt -site facilities, the developer must construct <br />a dry lid@ 6t vot line at the time of construction, if required by <br />the UtilitL#h department. The final determination for the type of <br />non-residential establishment which can utilize a private system <br />shall be a by the Utilities Department, Community Development <br />Department# and Environmental Health Department. - <br />System Availability: A system is considered available when a <br />collection or distribution line exists in a public easement or <br />right-of-way. <br />Distance Determination: Distance determinations are made from the <br />nearest point of the project (area of development) to the public <br />facility directly through public easements or public rights-of-way. <br />ADOPTED INTO LAND DEVELOPMENT REGULATIONS BY BOARD- OF COUNTY <br />COMMISSIONERS SEPTEMBER 29, 1992 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.