My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
10/17/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 11:41:41 AM
Creation date
12/6/2017 3:11:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/17/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work a_specifie <br />Documents. The Work is generally described Vows: <br />The project will consist of <br />Avenue and 21st Street SW. The pri <br />mast arm traffic signals, milling <br />crosswalks and curb ramps, includ <br />and pavement markings. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for i <br />part is generally <br />ame: <br />INT <br />CoINI Bid <br />Project <br />rk <br />at <br />and <br />ST STREET SW <br />OPROVEMENTS <br />643 <br />hereinafter set forth, <br />in the Contract <br />ents at 27"' <br />tallation of <br />pedestrian <br />ed signage <br />may be the whole or only a <br />21ST ST. SW, VERO BEACH, FL. <br />3.01 The Indian River0bunly Public Works Department is hereinafter called the ENGINEER <br />and will act asER's representative, assume all duties and responsibilities, and have <br />= <br />the rights a u. "ority assigned to ENGINEER in the Contract Documents in connection <br />with the completion of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CONTRACT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />@BCL@840EB062.doc <br />00520-2 <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@840EB062\@BCL@840EB062.doc <br />P54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.