My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/17/2017 (2)
CBCC
>
Meetings
>
2010's
>
2017
>
10/17/2017 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 11:41:41 AM
Creation date
12/6/2017 3:11:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/17/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
X Ten sets of complete Conceptual, Preliminary or Final PD (final plat plans must be signed and seated by <br />surveyor). flans as per Chapter 915, pursuant to the We of approval being requested, <br />N/A Any requirements of the zoning or subdivision ordinance which the applicant is requesting to be waived <br />(such as minimum lot width and size, street frontage requirements, setbacks, etc.), shall be clearly <br />indicated by section and paragraph numbers, together with the rationale for the waiver xcquest(s), on an <br />attached sheet <br />N/A 2 Aerials for conceptual or preliminary PDs <br />N/A Itemized response to pre -application for conceptual or concurrent applications <br />X 2 sealed surveys <br />N/A 3 sets of floor plans and elevation for commercial or multi -family buildings <br />e—a—f-aeo'— written Statement and Photograph of Posted Sign <br />Four Final FUVJ <br />CONSTRUCTION COMPLETE - BUILT OUT: <br />(A) Certificate of Completion from Public Works or copy of letter to Public Works and Utilities <br />rewiring inspection of improvements <br />IF IMPROVEMENTS ARE DEDICATED TO THE PUBLIC: <br />(B) Original Engineer's Certified Cost for Improvements (Signed and Sealed) OR <br />X CONSTRUCTION INCOMPLETE - BONDING OUT. <br />(A) Original Engineer's Certified Cost Estimate for Improvements (Signed and sealed) <br />xngineer,s statement that certificate of completion will be obtained prior to approval <br />X COPIES OF DOCUMEN[TS TO RB REQ0RDHD *qTH 14EB FR4AL—PLA�P <br />previously recorded with The Falls at Grand Harbor Plat 29 <br />Covenants, Deed Restrictions, Bylaws, etc. or Stsdement There Are None (ORB 1922, Pg. 24 73) <br />b. Property Owners Association Articles of Incorporation or Statement Indicating Why Recording of <br />POA iSNot Required (ORB 1922, Pg. 2560) <br />A <br />F-TAMUMniLy Deftlopn=MJsMW'�cvlApplice-nM]DAP?Aoc Roviud Jmuwy 2011 Pow 3 of3ttachment 1 <br />am <br />
The URL can be used to link to this page
Your browser does not support the video tag.