Laserfiche WebLink
14. Additional submittal requirements may be required by staff at a formal pre -application <br />conference or a TRC meeting, whichever occurs first, based upon staff concerns and issues <br />particular to the site, surrounding area, or proposed use. The posted sign notice <br />requirements of 914.14(17) and 914.06(5)(g) shall be applied. <br />(c) The review and approval process for a conceptual plan application shall be the process <br />appropriate for the use approval level (special exception, administrative permit, permitted). <br />(5) All site plan applications shall include statements on the plans regarding each of the following: <br />(a) Name of the project; <br />(b) Statement of intended uses to occur on the site; <br />(c) A statement describing the proposed means of conveying ownership in the property; <br />(d) Name, address, and telephone number of all equitable owners; <br />(e) Name, address and telephone number of the applicant and firm which he or she represents; <br />(f) Name, address, signature, and registration number of the professionals preparing the plan; <br />(g) Legal description, including the section, township and range, and the property appraiser's tax <br />parcel number(s) of the subject property; <br />(h) Date plan was drawn and date of any subsequent revision(s); <br />(i) Approximate timetable (month and year) for completion of the project, and any proposed phases <br />of a phased development project. All phases of multi -phase projects must be able to meet all of <br />the site plan requirements within the subject phase; <br />Q) Existing zoning and comprehensive plan land use map designation(s) of the site and adjacent <br />sites; <br />(k) Estimated number of vehicle trips attracted to the site using the latest edition of the ITE Trip <br />generation rates, to ensure compliance with the requirements and provisions of Chapter 952. <br />Page 4 <br />P167 <br />