Laserfiche WebLink
SJRWMD FY 2017-2018 Final Budget <br />• S-164 Structure, located on the east side of Taylor Creek Reservoir in the <br />northeast corner of Osceola County, replacing two side slide gates, upstream <br />debris barriers, and sheet pile walls. <br />• Replacing existing hydraulic lifting systems at Structure 96D with a drum and <br />cable lift system, decreasing long-term maintenance and increasing operational <br />efficiency. <br />• Completing the final phase of improving the M -Levee System as part of the <br />Upper St. Johns River Basin Flood Protection program, repairing, reshaping, and <br />improving over 3 miles of existing internal levees separating the Blue Cypress <br />Marsh Conservation Area and the St. Johns Water Management Area. <br />• Performing minor water control structure repairs, repairing and replacing culverts <br />in compliance with USACE guidelines. <br />Page 22 <br />