SCOPE OF SERVICES <br />Consultant will perform the following amended task services: <br />TASK 1.0 COORDINATION WITH SJRWMD <br />Subtask 1.1 Pre -Application Conference_ <br />No change to this subtask. <br />Subtask 1.2 Preparation of Modeling Approach Memorandum <br />No change to this Subtask. <br />Subtask 1.3 Preparation of Permit Application <br />In addition to preparing SJRWMD Form No. 40C -2.900(1)(e), Consumptive Use Permit for Public Supply— <br />Form E and supporting documentation as outlined in the original Scope of Services, the Consultant <br />prepared the updated population projections and corresponding wellfield allocation for use in <br />determining the modeling scenarios to be used. Best available information provided by the County was <br />in the form of ERUs in use, reserved, or newly sold (including projections). This is not a conventional <br />method of demonstrating population and demand for CUP purposes; however, SJRWMD staff <br />recognized that the County is in a unique position due to the large volume of reserve capacity (ERUs that <br />have been purchased for units that have not yet been constructed) and agreed to accept the <br />methodology. Several iterations of the demand tables were prepared and numerous meetings were held <br />with SJRWMD and County staff to finalize the demand numbers to be used in the modification request. <br />This amended subtask includes 9 iterations of the tables and 11 meetings/conference calls to finalize the <br />demand projections. <br />In addition, Consultant assisted with coordination and updates to the previous avoidance plan action <br />items to address the items that were not completed in accordance with the approved schedule. This was <br />not included in the original Scope of Services (only the update to the avoidance plan resulting from the <br />current modeling effort was included). <br />Subtask 1.4 Response to Requests for Additional Information <br />No change to this subtask. <br />Subtask 1.S Review of Draft Permit <br />No change to this subtask. <br />Task 2.0 MEETING WITH SJRWMD <br />No change to this subtask. <br />TASK 3.0 PROJECT MANAGEMENT AND QUALITY CONTROL <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this scope is <br />consistent with Consultant's standards and the County's expectations. Specific activities included are <br />identified below: <br />Subtask 3.1 Project Quality Management <br />No change to this subtask. <br />Subtask 3.2 Project Status Reports <br />No change to this subtask. <br />p2086_Ur with Eah{bitsdoa <br />A-2 <br />co <br />P111 <br />