My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/24/2017
CBCC
>
Meetings
>
2010's
>
2017
>
10/24/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 11:48:00 AM
Creation date
12/6/2017 3:54:54 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/24/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
278
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
s <br />DocuSign Envelope ID: 27562A39-54B9-4984-BOFD-AEIDCBC76974 <br />STATE OF FLORIDA OWARTMENr OF TRANSPORTATION sMi11040 <br />LOCAL AGENCY PROGRAM AGREEMENT PROtiRAMMAK46BUNT <br />OW-MIS <br />-MIS <br />Pape, <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 436860-1-58-01 <br />This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br />Transportation and <br />Indian River County <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 2.471 Miles <br />PROJECT DESCRIPTION: Indian River Blvd. Sidewalk Improvements from 3r St to 531' St. Construction of a 6' wide <br />concrete sidewalk, pedestrian crossing Improvements at the Indian River Blvd. and 37th St intersection, the Indian River <br />Blvd. and 416t St. intersection, and the Indian River Blvd. and 450' St. intersection, drainage improvements, earthwork, <br />maintenance of traffic, erosion control and pavement markings. <br />SPECIAL CONSIDERATIONS BY AGENCY: <br />The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the <br />Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where <br />applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and <br />the funding action from any other source with respect to the project <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A . <br />b) Design to be completed by N/A . <br />c) Right -of -Way requirements identified and provided to the Department by NIA . <br />d) Right -o# -Way to be certified prior to advertising for construction (All Phase 58 LAPS) <br />e) Construction contract to be let by 3/12/2018. <br />:f) Construction to be completed by 12131/2019. <br />If this schedule cannot be met, the Agency will notify -the Department in writing with a revised schedule or the project Is <br />subject to the withdrawal of federal funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: NIA <br />=1I <br />
The URL can be used to link to this page
Your browser does not support the video tag.