Laserfiche WebLink
EXHIBIT -B <br />DETAILED COST TABULATION <br />FOR 14385 80T" AVENUE WATER MAIN EXTENSION <br />Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit Price <br />Total Price <br />1 <br />Engineering <br />1 <br />EA <br />$ 2,500.00 <br />$ 2,500.00 <br />2 <br />Permiting <br />1 <br />EA <br />$ 1,280.00 <br />$ 1,280.00 <br />3 <br />Labor <br />1 <br />LS <br />$5,000.00 <br />$ 5,000.00 <br />4 <br />Jumper -Installation & Removal <br />1 <br />EA <br />$1,600.00 <br />$ 1,600.00 <br />5 <br />8" C900 PVC Pipe <br />300 <br />LF <br />$26.06 <br />$ 7,818.00 <br />6 <br />8" Gate Valve <br />1 <br />EA <br />$2,083.00 <br />$ 2,083.00 <br />7 <br />Double Service <br />1 <br />EA <br />$2,694.00 <br />$ 2,694.00 <br />4 <br />Survey <br />1 <br />$550.00 <br />$ 550.00 <br />5 <br />Sod <br />1 <br />$200.00 <br />$ 200.00 <br />Total Improvement Cost of 8- <br />inch water main <br />$ 23,725.00 <br />Up size hydraulic fare share from <br />2 -inch to 8 -inch; 75% <br />$ 17,793.75 <br />Developer's Share <br />$ 13,048.75 <br />Total Fare share cost for <br />Adjacent Properties <br />(14380,14390 & 14395) <br />$ 10,676.25 <br />Per Parcel Fare share cost for <br />Adjacent Properties <br />(14380,14390 & 14395) <br />$3,558.75 <br />Page 7 <br />F:\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits \80th Ave Water Main Extension - UCP# 3337\Developers Agreement\Developers Agreement <br />- Off -Site Watermain-Revl Arjuna.docx <br />