My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-209A
CBCC
>
Official Documents
>
2010's
>
2017
>
2017-209A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2017 12:09:30 PM
Creation date
12/18/2017 12:09:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/12/2017
Control Number
2017-209A
Agenda Item Number
8.D.
Entity Name
Atkins North America
Subject
Wabasso Fishing Pier Demolition Project
Alternate Name
Work Order No. 6 Phase 2 Services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATKINS <br /> EXHIBIT A <br /> Proposal to Provide <br /> Professional Engineering Services <br /> for <br /> Indian River County — GEC Work Order 06 <br /> Phase 2 — Permitting, Construction Plans, Bidding, and Construction Services <br /> Wabasso Fishing Pier Demolition <br /> Wabasso, Florida <br /> Indian River County (County) has requested services in support of the Wabasso Fishing Pier Demolition <br /> Project under the terms of Continuing Contract Agreement for Professional Services (dated November 15, <br /> 201 1) and Contract renewal (dated November 4, 2014). The Wabasso Fishing Pier was significantly <br /> impacted by the passing of Hurricane Matthew in early October 2016. causing the loss of 100' from the <br /> 525' west span and 300' from the 475' east span. The County has requested services to assist in the <br /> environmental filed surveys, engineering planning and design, permitting, bidding, and construction <br /> services for the full demolition of the Wabasso Fishing Pier. <br /> It is anticipated that the demolition will include the following elements: <br /> o West Pier <br /> • Removal of eight intact 50' pier span sections <br /> • Removal of one intact 25' pier span section (at abutment) <br /> • Removal of two damaged/displaced/submerged 50' pier span section <br /> • Removal of eleven intact pile pairs with caps <br /> • Removal of 150' of upland sidewalk <br /> o East Pier <br /> • Removal of three intact 50' pier span sections <br /> • Removal of one intact 25' pier span section(at abutment) <br /> • Removal of six damaged/displaced/submerged 50' pier span section <br /> • Removal of five intact pile pairs with caps <br /> • Removal of five damaged/displaced/submerged pile pairs with caps <br /> • Removal of 100' of upland sidewalk <br /> These services are expected to be completed in two phases. Phase 1 — Data Collection and Preliminary <br /> Planning, was covered in a previous Task Order and is complete. This Task Order will cover Phase 2, and <br /> will include design, permitting, bidding, and construction services. <br /> At the request of the County, Atkins (Engineer)has prepared this Phase 2 scope of services as follows: <br /> SECTION 1 PHASE 2 SCOPE OF SERVICES <br /> TASK 1: PERMITTING ASSISTANCE <br /> The Engineer shall assist the County in their efforts to secure regulatory approval for the Project. The <br /> permitting agencies are independent government agencies,and the Engineer cannot make any guarantee in <br /> regards to the ultimate issuance of permits or the duration of the process. The Engineer will utilize their <br /> experience with the permitting process to help facilitate as smooth and efficient a process as is possible to <br /> the benefit of the Project. <br /> Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.