My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 12:57:34 PM
Creation date
12/21/2017 11:37:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/05/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka RE,, Public Works Director <br />FROM: And Sobczak, infrastructure Project Manager, <br />SUBJECT: Work Order No. 3, Jay Ammon Architects, Inc. <br />Indian Diver County Courthouse Roof Replacement <br />DATE: November 21 2017 <br />DESCRIPTION AND_CONIiITIONS <br />In September 2017, Hurricane Irma produced over 17 -inches of wind driven rain in Indian. River <br />County. During the hurricane, roof and window leaks occurred at the Courthouse causing damage to <br />walls and carpets in numerous offices. Approximately two weeks after the hurricane, additional leaks <br />occurred when a low-pressure system produced seven inches of wind driven rain over a period of <br />five days. <br />Prior to the recent storm events, the Courthouse has experienced leaks for several years and the roof <br />has been in need of replacement for over 5 -years, In 2016, County staff, added funding to the <br />Facilities section of the 5 -year Capital Improvement ,Element (CIE) for the replacement of the <br />Courthouse roof in .FY 16=17. The Board approved the FY 16-17 CIE on December 6, 2016. <br />On April 18, 2014 the Board of County Commissioners approved a. Professional Services Agreement <br />with Tay Ammon Architect, Inc. to perform roofing consultation services to include evaluations of <br />existing roofing conditions, design solutions for remedial work, design. solutions for roof <br />replacement, preparation of design, documents, and prefect management. On November 6, 2017 Jay <br />Amnion Architect, Lie. submitted a proposal for the design, assistance in bidding, and construction <br />administration for replacement of the Courthouse roof, including coordination with an ongoing <br />Courthouse seal and wall restoration project. <br />FUNDING <br />Funding for the project will be included in the FY 17-18 CIE and budgeted in Optional Sales <br />Tax/Facilities Maint./Courthouse Roof acct #/• 31522019-066510-16029. <br />P165 <br />
The URL can be used to link to this page
Your browser does not support the video tag.