My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/05/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/05/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 12:57:34 PM
Creation date
12/21/2017 11:37:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/05/2017
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA CONSENT <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />FROM: Richard B. Szpyrka, P.E., Public Works Director <br />SUBJECT: Health Department Chiller Supply Line Installation <br />DATE: November 27, 2017 <br />DESCRIPTION AND CONDITIONS <br />The Health Department HVAC Chiller unit installed in 2010 is failing and is in need of replacement. Public <br />Works Facilities staff is always looking for ways to reduce costs, but continue the same high level of <br />service to the public. Facilities and Trane staff analyzed the capacity of the existing chiller units used to <br />cool Buildings A & B. These chiller units are scheduled to be replaced in early 2018, butthey still have the <br />necessary capacity capable of cooling the Health Department and Buildings A & B. <br />As such, Facilities requested quotes from several mechanical contractors to install a chilled watersupply <br />line from the chiller units behind Building B to the Health Department, the necessary valves and piping to <br />connect the Health Department to the existing chiller units, and engineered drawings for the project. <br />Mid -State Mechanical provided the lowest quote at $69,527.00 for the installation of the above. A <br />replacement chiller for the Health Department is $106,000. Not only do we save $36,473.00 by <br />connecting to the existing Building A & B chiller units, we also estimate a savings of approximately <br />$40,000 to $50,000 a year in our Health Department electric bill. <br />FUNDING <br />Funding is budgeted and available from Optional Sales Tax/Facilities Management/Other <br />Improvements Except Building - Acct #31522019-066390. <br />RECOMMENDATION <br />Staff recommends the Board waive the bid requirement for this work, approve the quote for Option 1 <br />from Mid -State Mechanical in the amountof $69,527.00and authorizethe Purchasing Managerto issue a <br />Purchase Order. <br />ATTACHMENTS <br />Mid -State Mechanical Quote <br />APPROVED AGENDA ITEM FOR: December 5, 2017 <br />P171 <br />
The URL can be used to link to this page
Your browser does not support the video tag.