Laserfiche WebLink
e. D. <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Natural Resources Manager <br />SUBJECT: Work Order No. 6 Atkins North America, Inc. <br />Wabasso Fishing Pier Demolition Project — Phase 2 Services <br />DATE: December 1, 2017 <br />BACKGROUND <br />The Wabasso Fishing Pier was significantly impacted by the passing of Hurricane Matthew in early <br />October 2016, causing approximately 400 LF of the Pier superstructure to be displaced from its <br />substructure and deposited into the Indian River Lagoon south of its previous location. The <br />current status of the fishing pier causes potential navigation hazards as well as a threat to the <br />surrounding CR 510 Causeway. As the pier is damaged beyond repair, the only viable alternative <br />is to completely demolish and remove the structure. A project location map and site photos are <br />provided as.attachments to this agenda item. <br />DESCRIPTION AND CONDITIONS <br />On November 15, 2011, the Board approved a contract with Atkins North America, Inc. (Atkins) <br />for Professional Services relating to Public Works, Solid Waste Disposal District, Utilities -Major, <br />and Utilities -Minor systems for a three-year term. On November 4, 2014, the Board renewed the <br />contract for an additional three-year term to November 16, 2017. On October 24, 2017, the <br />Board extended the contract until February 15, 2018. Atkins is the selected County Consultant <br />for professional services related to the Wabasso Fishing Pier Demolition Project. <br />On June 13, 2017, the Board approved Work Order No. 5 to cover Phase 1 services relative to <br />field data collection and preliminary planning in order to obtain the necessary permits for the <br />demolition of the Wabasso Fishing Pier. To date, all the services under Work Order No. 5 have <br />been completed. <br />The proposed Work Order No. 6 provides professional services (phase 2) relative to permitting, <br />construction plans, bidding, and construction services. <br />Work Order No. 6 totals a lump sum amount of $88,932. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@90005C59\ n BCL n 900C5C59.docx <br />P26 <br />