My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/12/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/12/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2025 1:17:03 PM
Creation date
1/10/2018 9:29:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/12/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />INDIAN RIVER COUNTY, FLORIDA <br />DEPARTMENT OF UTILITY SERVICES <br />Date: November 27, 2017 <br />To: Jason E. Brown, County Administrator <br />From: Vincent Burke, P.E., Director of Utility Services <br />Prepared By: Arjuna Weragoda, P.E., Capital Projects Manager <br />Subject: Developer Agreement For The Extension Of the Water Main along 801h Avenue <br />DESCRIPTIONS AND CONDITIONS: <br />The Developer (Reinaldo and Ginger De Armas) extended the existing 8 -inch water main along 80th Avenue <br />to serve their property (14385 80"' Avenue) and the neighbor's property (14375 80"' Avenue). The Developer <br />hired a local Florida registered engineer to design, permit and perform construction inspection services. <br />Timothy Rose Contracting, Inc., secured by the Developer, installed the water main per Indian River County <br />Department of Utility Services (IRCDUS) standards and specifications. <br />The installation of the water main was pressure tested, as well as successful bacteriological sampling <br />performed and cleared by the Florida Department of Environmental Protection (FDEP) in August 2017. <br />IRCDUS accepted the water main in late September 2017. <br />ANALYSIS: <br />The construction comprised of approximately 300 -linear feet of an 8 -inch diameter water main on the west <br />side running south along 80th Avenue. Now that the water main has been installed, the Developer would <br />like to enter into a Developer's Agreement with the County where the Developer will be reimbursed the <br />fair share cost of the other benefitting parcels once those properties have connected and as outlined in <br />the Developer's Agreement. As shown on Exhibit B of the attached agreement, the estimated offsite water <br />main cost sharing between the Developer and the benefitting property owner's is as follows: <br />Developer's Share $13,048.75 <br />Benefitting Property Fair Share $10,676.25 <br />Total Project Cost $23,725.00 <br />The costs were determined based on a hydraulic fair share (55% Developer's share; 45% Benefitting Property <br />Fair Share) of up-sizing the infrastructure to serve future customers in the Ercildoune Heights area in <br />Sebastian. <br />P38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.