Laserfiche WebLink
Consent Agenda Item <br /> f 3: , ,6 <br /> r°` ,1„, INDIAN RIVER COUNTY, FLORIDA <br /> ' :\ l\-,!ir,r DEPARTMENT OF UTILITY SERVICES <br /> Date: November 27, 2017 <br /> To: Jason E. Brown,County Administrator <br /> From: Vincent Burke, P.E., Director of Utility Services <br /> Prepared By: Arjuna Weragoda, P.E.,Capital Projects Manager <br /> Subject: Developer Agreement For The Extension Of the Water Main along 80th Avenue <br /> DESCRIPTIONS AND CONDITIONS: • <br /> The Developer(Reinaldo and Ginger De Armas) extended the existing 8-inch water main along 80th Avenue <br /> to serve their property(14385 80th Avenue)and the neighbor's property(14375 80th Avenue).The Developer <br /> hired a local Florida registered engineer to design, permit and perform construction inspection services. <br /> Timothy Rose Contracting, Inc.,secured by the Developer,installed the water main per Indian River County <br /> Department of Utility Services(IRCDUS)standards and specifications. <br /> The installation of the water main was pressure tested, as well as successful bacteriological sampling <br /> performed and cleared by the Florida Department of Environmental Protection (FDEP) in August 2017. <br /> IRCDUS accepted the water main in late September 2017. <br /> ANALYSIS: <br /> The construction comprised of approximately 300-linear feet of an 8-inch diameter water main on the west <br /> side running south along 80th Avenue. Now that the water main has been installed,the Developer would <br /> like to enter into a Developer's Agreement with the County where the Developer will be reimbursed the <br /> fair share cost of the other benefitting parcels once those properties have connected and as outlined in <br /> the Developer's Agreement. As shown on Exhibit B of the attached agreement,the estimated offsite water <br /> main cost sharing between the Developer and the benefitting property owner's is as follows: <br /> Developer's Share $13,048.75 <br /> Benefitting Property Fair Share $10,676.25 <br /> Total Project Cost $23,725.00 <br /> The costs were determined based on a hydraulic fair share(55%Developer's share;45%Benefitting Property <br /> Fair Share) of up-sizing the infrastructure to serve future customers in the Ercildoune Heights area in <br /> Sebastian. <br /> P38 <br />