My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-001
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2018 9:06:34 AM
Creation date
1/10/2018 9:44:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/09/2018
Control Number
2018-001
Agenda Item Number
8.D.
Entity Name
Masteller & Moler, Inc.
Subject
Hobart Park Baseball Fields
Ballfield Renovation and Expansion Project
Work Order No 5
Area
east side of 58th Ave at 77th St
Document Relationships
2018-130
(Cover Page)
Path:
\Official Documents\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Project No. 1759 <br /> HOBART PARK BASEBALL FIELDS—Work Order No. 5 MM File#1756 <br /> Page 4 of 5 <br /> The selected Contractor for the project shall be responsible for acquiring and adhering to an NPDES Soil <br /> Erosion and Sediment Control permit. <br /> Items to Be Provided By Client: <br /> To support our design and permitting services on this project, it is understood the County will provide the <br /> following information: <br /> 1. Boundary, Topographic & Tree Survey in Autocadd with topographic survey information on <br /> NAVD'88 datum; <br /> 2. Soils Investigation to support the Stormwater System Designs; <br /> 3. Bleacher Plans with Dimensions; <br /> 4. Site Lighting Signed &Sealed Structural (Poles) & Electrical Plans (Fixtures) from Lighting Vendor <br /> Any and all items not specifically set forth in this Work Order are excluded. Specifically excluded items include <br /> but are not limited to: application fees, irrigation plans, and construction services. <br /> SECTION III -TIME FOR COMPLETION &DELIVERABLES/WORK PRODUCT <br /> 1. Project shall be completed as follows: <br /> Schematic Design 20 Working Days <br /> Design Development 30 Working Days <br /> Permitting/Construction Plans 90 Working Days <br /> 2. Deliverables—The ENGINEER shall provide the COUNTY: <br /> a. Preliminary Construction Plans 2 Sets <br /> b. Final Construction Plans(Bid Sets) 10 Sets <br /> c. Permit Application Forms As Required <br /> d. Related digital AutoCAD and PDF files <br /> SECTION IV-COMPENSATION <br /> The COUNTY agrees to pay, and the ENGINEER agrees to accept a maximum not-to-exceed amount of <br /> $ 66,025.00 for the above-described services rendered as identified in Sections I and II of this Work Order <br /> No. 5 based on the following: <br /> Civil Engineering $ 40,600.00 <br /> Architectural Sub-Consultant * $ 16,675.00 <br /> Structural Design (Bleacher Slabs Only) $ 1,725.00 <br /> Landscape Sub-Consultant $ 4,025.00 <br /> Reimbursables ** (not to exceed) $ 3,000.00 <br /> Total Maximum Amount Not-To-Exceed $ 66,025.00 <br /> *Architectural fees include mechanical/electrical/ plumbing/structural fees for the structures. <br /> **Reimbursement for payment of direct costs, including reproduction, copies, prints, mail, Fed-Ex, <br /> etc. is estimated at$ 3,000.00. Actual cost will vary depending on quantity provided. <br /> We shall invoice monthly for these services based on the percentage of completion of each task. <br />
The URL can be used to link to this page
Your browser does not support the video tag.