My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-003
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:22:29 AM
Creation date
1/10/2018 10:30:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/09/2018
Control Number
2018-003
Agenda Item Number
8.P.
Entity Name
Aptim Environmental & Infrastructure, Inc.
Subject
Biological support services for beach and dune renourishment
Area
Wabasso Beach
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
County Project Manager, in detail sufficient for proper prepayment and post payment <br />audit. Upon submittal of a proper invoice the County Project Manager will determine if <br />the tasks or portions thereof have been satisfactorily completed. Upon a determination <br />of satisfactory completion, the County Project Manager will authorize payment to be <br />made. All payments for services shall be made to the Consultant by the COUNTY in <br />accordance with the Local Government Prompt Payment Act, as may be amended from <br />time to time (Section 218.70, Florida Statutes, et seq.). <br />5.2 The COUNTY may at any time notify the Consultant of requested changes <br />to the Services under an existing Work Order, and thereupon the COUNTY and the <br />Consultant shall execute a mutually agreeable amended Work Order or a new Work <br />Order. <br />5.3 The COUNTY shall have the sole right to reduce or eliminate, in whole or in <br />part, any portion of the Services under an existing Work Order at any time and for any <br />reason, upon written notice to the Consultant specifying the nature and extent of the <br />reduction. In such event, the Consultant shall be paid for the Services already performed <br />and also for the Services remaining to be done and not reduced or eliminated, upon <br />submission of invoices as set forth in this Agreement. <br />5.4 The COUNTY may, at any time and for any reason, direct the Consultant to <br />suspend Services, in whole or in part under this Agreement. Such direction shall be in <br />writing, and shall specify the period during which Services shall be stopped. The <br />Consultant shall resume its Services upon the date specified, or upon such other date as <br />the COUNTY may thereafter specify in writing. Where the COUNTY has suspended the <br />services under this Agreement for a period in excess of six (6) months, the compensation <br />of Consultant for such suspended Services may be subject to modification. The period <br />during which the Services are stopped by the COUNTY shall be added to the time of <br />performance of this Agreement. <br />6. ADDITIONAL WORK. <br />6.1 If services in addition to the Services provided hereunder are required or <br />desired by the County in connection with the Project, the COUNTY may, at the sole option <br />of the COUNTY: separately obtain same outside of this Agreement; or request the <br />Consultant to provide, either directly by the Consultant or by a sub -consultant, such <br />additional services by a new Work Order or by a written amendment to a specific Work <br />Order. In order to remain consistent with State Beach Management Funding Assistance <br />Program policies the County is limiting consultant mark-up of sub -consultant contracts to <br />a 5 percent maximum and approved consultant travel rates as set forth in Chapter 112 of <br />the Florida Statutes. <br />X <br />F:\Marketing\_Proposals\Florida Counties\Indian River\2017 Indian River County\Proposals\Sector 3 Wabasso <br />Beach\_Contracting\2017-12-21 FEMA Beach Consulting Agreement Sector 3_FINAL.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.