My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/2017
CBCC
>
Meetings
>
2010's
>
2017
>
11/21/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2018 3:36:06 PM
Creation date
1/12/2018 3:33:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/21/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />Indian River County Department of Utility Services <br />Van Antwerp Property (Countryside Citrus) Water Supply Restoration <br />and Well Addition <br />PROTECT UNDERSTANDING <br />Indian River County Utilities (IRCU) is in the process of mitigating water <br />withdrawal impacts to the Van Antwerps (VA) existing groundwater wells from the <br />Hobart wellfield. The following scope consists of meetings and discussions, <br />preparation of documents, coordination, and implementation of the construction of <br />one new supply well, wellpump, and retrofitting one of Van Antwerps (VA) <br />irrigation supply wells #1 with submersible pumps & motors. The intent is to <br />restore, improve and preserve capacity of these wells from future impacts from the <br />Hobart wellfield. <br />SCOPE OF WORK <br />Below is the anticipated scope of work for VA Farm (Countryside) raw water <br />supply and well addition. <br />TASK 1- MEETINGS AND DISCUSSIONS <br />Consultant will attend meetings, participate in conference calls, and be available for <br />discussions with Indian River County Utilities (IRCU) staff, St Johns River Water <br />Management District (SJRWMD), the Van Antwerps, and others. Consultant will <br />prepare for these meetings, including preparation of documents, participate in pre - <br />meeting discussions, and provide follow up to the meetings and discussions. <br />Consultant will attend and participate in conference calls during design and <br />implementation of the work described herein. It is assumed that weekly conference <br />calls will be attended initially, with call frequency reducing to twice monthly <br />during implementation of the work. <br />TASK 2 - PREPARE DOCUMENTS FOR NEW SUPPLY WELL <br />Consultant will prepare design documents and technical specifications for one new <br />permanent 6 -inch Floridan aquifer supply well #6 for the VAW property, and <br />installation of a new submersible well pump in the existing VAW well (#1). <br />C:\Users\mark.miller\Documents\IRCU Van Antwerp Water Supply Restoration 11.7.17.docx Pagel o174 <br />P71 <br />
The URL can be used to link to this page
Your browser does not support the video tag.