Laserfiche WebLink
Pay Item No. <br />Description <br />Estimated Qty. <br />706-3 <br />R.P.M. BI-DIRECTIONAL AMBER/AMBER <br />874 <br />711-11-121 <br />SOLID TRAFFIC STRIP (6"WHITE) THERMOPLASTIC <br />21143 <br />711-11-123 <br />SOLID TRAFFIC STRIP (12"WHITE) THERMOPLASTIC <br />194 <br />711-11-125 <br />SOLID TRAFFIC STRIP (24"WHITE) THERMOPLASTIC <br />277 <br />711-11-141 <br />SKIP TRAFFIC STRIPE (6" WHITE 2'-4') THERMOPLASTIC <br />772 <br />711-11-151 <br />SKIP TRAFFIC STRIPE (6" WHITE 6'-10') THERMOPLASTIC <br />1629 <br />711-11-170 <br />TURN ARROWS, THERMOPLASTIC <br />12 <br />711-4 <br />BICYCLE LANE MARKING, THERMOPLASTIC <br />25 <br />711-16-201 <br />SOLID TRAFFIC STRIPE (DOUBLE 6" YELLOW) THERMOPLASTIC <br />9907 <br />711-16-224 <br />SOLID TRAFFIC STRIP (18" YELLOW) THERMOPLASTIC <br />299 <br />711-16-231 <br />rSKIPTRAFFIC STRIPE (6" YELLOW 10'-30') THERMOPLASTIC <br />4190 <br />C�] � [�l > •i��� 13 L�� LSP► �� <br />SR. PROJECT ENGINEER <br />PROJECT ADMINISTRATOR <br />SR. INSPECTOR <br />INSPECTOR <br />INSPECTOR'S AIDE <br />QUALITY CONTROL (QC) MANAGER <br />EARTHWORK CONSTRUCTION INSPECTOR LEVEL 1 <br />EARTHWORK CONSTRUCTION INSPECTOR LEVEL 2 <br />ASPHALT PAVING TECHNICIAN LEVEL 1 <br />ASPHALT PAVING TECHNICIAN LEVEL 2 <br />