My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/17/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
02/17/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2018 4:19:23 PM
Creation date
1/22/2018 10:23:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/17/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00520 - Agreement (Public Works) <br />THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br />State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br />OWNER) <br />and <br />(hereinafter called CONTRACTOR). <br />OWNER and CONTRACTOR, in consideration of the mutual covenants„hereinafter set forth, <br />agree as follows: <br />ARTICLE 1 - WORK <br />1.01 CONTRACTOR shall complete all Work as specified or ic- =-min the Contract <br />� ; a <br />Documents. The Work is generally described as follows: <br />The project will consist of the construction of la; wide concretes , -"along the <br />east side of Old Dixie Highway between 38th Land 45th Street, miss length of <br />approximately 4,500 linear feet. <br />ARTICLE 2 - THE PROJECT <br />2.01 The Project for which the Work,:#R <br />part is generally described as fo <br />Project Name: OId Dixie Hfic <br />Documents may be the whole or only a <br />4mprovements, 38th Lane to 45th <br />County Projec <br />FM Number: 42 <br />Bid . :� ,� ber: 20140 <br />Proj= ° ?�;.,=s: Old ►Aq= High <br />ARTICL : GINE <br />av from 38th Lane to 45th Street, Indian River <br />3.01 he Indian fiver r`o' my Public Works Department is hereinafter called the ENGINEER <br />'s representative, assume all duties and responsibilities, and have <br />and .'. on ¢m assigned to ENGINEER in the Contract Documents in connection <br />with the comple of the Work in accordance with the Contract Documents. <br />ARTICLE 4 - CT TIMES <br />4.01 Time of the Essence <br />A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br />for final payment as stated in the Contract Documents are of the essence of the Contract. <br />4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br />A. The Work will be substantially completed on or before the 60th day after the date when the <br />Contract Times commence to run as provided in paragraph 2.03 of the General <br />Conditions, and completed and ready for final payment in accordance with paragraph <br />00520 - Agreement (Public Works) FOR LAP PROJECTS ONLY <br />00520 - 2 <br />C:\Users\mnixon\AppData\Local\Microsoft\Windows\Temporary Internet Files \Content.Outlook \VARGF57U\00520 -Agreement (Public Works) FOR LAP PROJECTS <br />ONLY.doc <br />58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.