My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TSI work completed <br />Task <br />Bid Price <br />Completed <br />1. Mobilization (includes demobilization) <br />$10,000 <br />2. Removal and disposal of fill, including proper <br />siltation control <br />2. Removal and disposal of fill, including proper <br />siltation control <br />$26,000 <br />3. Breaching of mosquito control dikes <br />3. Breaching of mosquito control dikes <br />$22,000 <br />4. Removal of Australian pine and Brazilian pepper <br />4. Removal of Australian pine and Brazilian pepper <br />$17,500 <br />5. Installation of navigational /manatee <br />protection signage <br />5. Installation of navigational /manatee <br />protection signage <br />$3,000 <br />TOTAL <br />TOTAL <br />$78,500 <br />TSI work completed <br />Task <br />Bid Price Completed <br />1. Mobilization (includes demobilization) <br />$10,000 <br />$5,000* <br />2. Removal and disposal of fill, including proper <br />siltation control <br />$26,000 <br />$3,999 <br />3. Breaching of mosquito control dikes <br />$22,000 <br />4. Removal of Australian pine and Brazilian pepper <br />$17,500 <br />$17,500 <br />5. Installation of navigational /manatee <br />protection signage <br />$3,000 <br />TOTAL <br />$78,500 <br />$26,499 <br />*Once demobilized, total cost for work completed: $31,499 <br />IQi-A-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.