My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF VERO BEACH, FLORIDA <br />DEPARTMENT: ELECTRIC UTILITY <br />PROJECT: ELECTRIC UTILITY SYSTEM STUDY <br />WORK ORDER NO. 1 <br />TO PROFESSIONAL ERVICES MASTER AGREEMENT <br />DATED�� �n WETWEEN CITY OF VERO BEACH <br />D POWERSERVICES INC. <br />This Work Order is issued pursuant to and incorporates herein tip; mtain Professional <br />Services Master Agreement ("Master Agreement") entered into on > y and between the <br />City of Vero Beach, Florida ("City") and PowerServices, Inc. U ("Service <br />Provider"). <br />City requests and Service Provider agrees to provide the services specified herein <br />pursuant to the terms and conditions herein set forth and in the Master Agreement. <br />SECTION 1— PROJECT DESCRIPTION <br />Professional Engineering Services for Electric Utility System Study. Study will address Power <br />Supply Planning, Transmission and Distribution Planning, Resource Adequacy, and Other <br />Optimization Strategies. <br />SECTION 2 — SCOPE OF SERVICES <br />Primary Focus: The primary focus of each study section and component is the <br />identification of short term and long term cost optimization benefits which will lower the <br />cost of delivering power to the Vero Beach retail customers. <br />A. Generation Site Options (60 days after data responses) <br />Objective: Determine the economical options associated with the existing power plant <br />ply <br />General: The City of Vero Beach owns and operates a 159 MW generation plant that is <br />currently used to self -supply the city's peaking power requirements. Vero Beach has begun <br />negotiations with OUC for the supply of all its supplemental power supply needs including <br />the peaking power requirements. Upon execution of a peaking power supply contract, the <br />city's generation plant will not be utilized and will likely be decommissioned. <br />1. Review power plant property. <br />2. Evaluate the long term viability of using the power plant property as a generating site <br />(peaking site). <br />3. Evaluate the economic benefits of demolishing the power plant while maintaining the <br />transmission station and substation. <br />Page 1 of 10 <br />C:\Users VkingDoctunents\Shannon \GSAs-Contracts-Vendor Forros\PowerServices\Vero Beach\Wait Order#1 Electric System Study.docx <br />267 <br />
The URL can be used to link to this page
Your browser does not support the video tag.