My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIENT: <br />PROJECT: <br />DESCRIPTION: <br />Indian River County <br />State Road 60 and 43rd Avenue Intersection Improvements <br />Level 3 Contamination Assessment <br />TOTAL ESTIMATED PROJECT COST: $59,000.00 <br />ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION' ITEM DESCRIPTION <br />UNITS <br />NUMBER <br />UNITS <br />COST PER <br />UNIT <br />EXTENSION <br />PERSONNEL <br />GENERAL FIELD EQUIPMENT AND EXPENDABLES <br />Senior Project Engineer <br />Per Hour <br />80 <br />*115.00 <br />$9,200.00 <br />Project Engineer <br />Per Hour <br />15 <br />$95.00 <br />$1,425.00 <br />Staff Engineer <br />Per Hour <br />$85.00 <br />Generator <br />Per Day <br />5 <br />$95.00 <br />$475 r r <br />Mobilization of Concerte Coring Equipment <br />Per Trip <br />5 <br />$150.00 <br />$750 r r <br />Senior Field Technician <br />Per Hour <br />80 <br />$50.00 <br />$4,000.00 <br />Peristaltic Purging Pump <br />Per Day <br />10 <br />*40.00 <br />$400 r r <br />Field Technician <br />Per Hour <br />80 <br />$45.00 <br />$3,800.00 <br />Water Level Indicator <br />Per Day <br />10 <br />*20.00 <br />$200.11 <br />Senior Technical Draftsman <br />Per Hour <br />$55.00 <br />Technical Draftsman <br />Per Hour <br />8 <br />$50.00 <br />$400.00 <br />pH/conductivity Meter <br />Per Day <br />10 <br />*25.00 <br />$250re <br />Technical Secretary <br />Per Hour <br />2 <br />*45.00 <br />$90.00 <br />Turbidity Meter <br />Per Day <br />10 <br />$55.00 <br />$550 r r <br />Subtotal: <br />' 318,715.05 <br />Dissolved Oxygen Meter <br />Per Day <br />10 <br />$55.00 <br />$550." <br />DRILLING <br />MOBI UZATION/DEMOBILIZATION <br />Lump Sum Men and Equipment Mob. <br />Per Mob. <br />2 <br />$250.00 <br />$500.00 <br />Tygon Tubing <br />Per Foot <br />40 <br />*2.50 <br />$100.r. <br />Polyethylene Tubing <br />Per Foot <br />800 <br />$0.60 <br />$480. r r <br />Deionized Water (decontamination) <br />Per 5 Gal. <br />2 <br />*14.00 <br />528. r r <br />55 -gallon Drum <br />Each <br />4 <br />$65.00 <br />r <br />5260.n <br />Subtotal: <br />$4,043." <br />COMPACTION AND GRAIN SIZE TESTS <br />Standard Proctor (ASTM 0-698) <br />Per Test <br />*85.00 <br />Modified Proctor (ASTM D-1557) <br />Per Test <br />$85.00 <br />Sieve Analysis (ASTM 0-421, D-422) <br />Per Test <br />$65.00 <br />Percent Fines (ASTM D-1140) <br />Per Test <br />$35.00 <br />Subtotal: <br />$0.n <br />ANALYTICAL LABORATORY ANALYSIS (Cost plus 15%) <br />EPA 8021 VOCs - water <br />Per Test <br />40 <br />$69.00 <br />$2,760. re <br />EPA 8021 VOCs - soil <br />Per Test <br />5 <br />$69.00 <br />$345.1 r <br />MONITORING WELL INSTALLATION <br />4 <br />- <br />Temporary 2" PVC Wellpoint <br />Temporary <br />Per Foot <br />500 <br />$18.00 <br />$9,000.00 <br />EPA 8270 PAH's - water or soil <br />Per Test <br />45 <br />$103.50 <br />$4,657. r <br />TRPH by FL -PRO - water or soil <br />Per Test <br />45 <br />$80.50 <br />$3,622. r <br />DRILLING ON TIME BASIS <br />Decontamination of Equipment <br />Per Hour <br />20 <br />*150.00 <br />*3,000.00 <br />Drumming Contaminated Soil (w/o Disp) <br />Per Drum <br />4 <br />*150.00 <br />*600.00 <br />EPA 8081A (Organochlorine Pest.) <br />Per Test <br />5 <br />*143.75 <br />$718.7 <br />Drum Disposal (non hazardous) <br />Per Drum <br />4 <br />$150.00 <br />$600.00 <br />EPA 8082 (PCB) <br />Per Test <br />5 <br />*143.75 <br />$718.7 <br />EPA B141A (Organophosphorus Pest.) <br />Per Test <br />5 <br />$126.50 <br />$832. . <br />EPA 8151A (Herbicides) <br />Per Test <br />5 <br />5218.50 <br />$1,092. r <br />RCRA 8 Metals <br />Per Test <br />5 <br />$88.55 <br />$442.7 <br />Sample Disposal Cost (Lump Sum) <br />Lump Sum <br />1 <br />$51.75 <br />$51.7 <br />Direct Push Groundwater Sampling <br />Per Day <br />5 <br />$1,500.00 <br />$7,500.00 <br />Subtotal: $21,200.00 <br />Subtotal: $15,042." <br />13-5402 Level 3 Cost Estimate.xls <br />111111.11F111 Ardaman & Associat <br />maimAn Geotechnical, Environmenta <br />Printed 2/2/2015 at 12:12 PM <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.