My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSENT <br />INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Joseph A. Baird, County Administrator <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />FROM: Christopher J. Kafer, Jr., P.E., County Engine <br />SUBJECT: Work Order No. 1, Masteller & Moler, Inc. <br />49th Street/US 1 Intersection Improvements <br />IRC Project No. 1412 <br />DATE: February 16, 2015 <br />DESCRIPTION AND CONDITIONS <br />On November 15, 2011, the Board of County Commissioners approved the Continuing Contract for <br />Professional Services with Masteller & Moler, Inc. and on November 4, 2014, approved an Extension and <br />Amendment of the Continuing Contract. <br />The purpose of Work Order No. 1 is to provide planning and design services for intersection <br />improvements at the following locations: eastbound left turn lane on 49th Street at Old Dixie Highway; <br />eastbound left turn lane on 49th Street at US 1; and north and southbound left turn lanes on Old Dixie <br />Highway at 49th Street. The 49th Street eastbound left turn lane at the approach to Old Dixie Highway will <br />require coordination with CDM Smith, Inc. for "All Aboard Florida" with the Florida East Coast (FEC) <br />Railway for the expanded roadway improvements. Work Order No. 1 is for a total lump sum amount of <br />$70,140.00. <br />FUNDING <br />Funding is budgeted in Account No. 31521441-066510-15010, Optional Sales Tax, 49th Street/US 1 <br />Intersection Improvements, in the amount of $70,140.00. <br />RECOMMENDATION <br />Staff recommends approval of Work Order No. 1 to Masteller & Moler, Inc. authorizing the above- <br />mentioned professional services as outlined in the attached Scope of Services (Exhibit A) and requests the <br />Board to authorize the Chairman to execute the attached Work Order No. 1 on their behalf for a total <br />lump sum amount of $70,140.00. <br />ATTACHMENTS <br />Work Order No. 1 <br />DISTRIBUTION <br />Masteller & Moler, Inc. <br />APPROVED AGENDA ITEM <br />FOR March 10, 2015 <br />BY L 11 /1j <br />Indian River County <br />F: \Public <br />Approv- • <br />Date <br />Administration <br />i <br />3 h 1) 5 <br />Budget <br />Ir t <br />Legal <br />�;^�0%�3/15 <br />) J �.s <br />Public Works <br />( <br />3 - 3 /‘ <br />Engineering <br />--'2-15.-- <br />" 1j.-- <br />F:\Public Works\ENGINEERING DIVISION PROJECTS I4I2-49th St USI Intersec ImprovWdmin\agenda items\BCC Agenda Masteller & Moler WO I.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.