My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/10/2015
CBCC
>
Meetings
>
2010's
>
2015
>
03/10/2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2018 12:58:22 PM
Creation date
1/23/2018 3:41:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
03/10/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
557
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IRC Work Order No. 1— Exhibit A" <br />49th Street / US 1 Intersection Improvements <br />Page 4 of 5 <br />Items to Be Provided By Client: <br />To support our design and permitting services on this project, it is understood the County will <br />provide the following information: <br />Right-of-way & Topographic Survey on NAVD 1988 datum <br />Soils Exploration Report <br />Environmental Assessment <br />Wetlands Mitigation Permitting (If Required) <br />Sketch & Legal Descriptions for Right -of -Way Acquisition <br />Additional Services: <br />Our scope of services does not include land surveying, soils investigations, FDOT U.S. Highway <br /># 1 roadway alteration designs, right-of-way acquisition negotiations, landscape / irrigation <br />designs, bidding services, construction administration services. Any services not specifically <br />provided for in the above scope will be considered additional services and can be performed at <br />our contract hourly rates. <br />Deliverables: <br />Deliverables for this project will consist of the following: <br />Conceptual Design <br />Preliminary Construction Plans <br />Final Construction Plans <br />Permit Application Forms <br />Schedule <br />2 Sets <br />2 Sets <br />10 Sets <br />As Required <br />Upon receipt of the Notice to Proceed and the information to be provided by the County, we <br />shall complete the scope of services for this project on the following schedule: <br />Task Working Days <br />Conceptual Plans 15 Days <br />FECRR Review & Comments Unknown <br />Preliminary Construction Plans 40 Days <br />Final Construction Plans 10 Days <br />Permit Application Forms 5 Days <br />Closure <br />In addition to the matters set forth herein, our Agreement shall include and be subject to, and <br />only to, the terms and conditions in the existing AGREEMENT dated November 15, 2011 and <br />amended on November 4, 2014 between Masteller & Moler, Inc. (ENGINEER) and Indian River <br />County (COUNTY). <br />Fees and times stated in this Work Order are valid for sixty (60) days after the date of this letter. <br />Hm 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.