My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/19/2017
CBCC
>
Meetings
>
2010's
>
2017
>
12/19/2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2019 4:29:15 PM
Creation date
1/23/2018 4:00:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/19/2017
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM � <br />TO: Jason E. Brown <br />County Administrator <br />THROUGH: Richard B. Szpyrka, P.E. <br />Public Works Director <br />FROM: James D. Gray, Jr. <br />Natural Resources Manager <br />SUBJECT: Release of Retainage for APTIM Coastal Planning and Engineering, Inc <br />Work Order No. 15 — Sector 3 Beach Restoration <br />2017 Physical Monitoring <br />DATE: December 11, 2017 <br />DESCRIPTION AND CONDITIONS <br />On March 19, 2013 the Board approved a contract with APTIM Coastal Planning & Engineering, <br />Inc. (APTIM) f/k/a CB&I Coastal Planning and Engineering, Inc. for professional coastal <br />engineering services in Indian River County for a two-year term, 2013-2015. On March 17, 2015 <br />the Board renewed the contract until March 19, 2017. On April 11, 2017, the Board extended <br />the contract until December 31, 2017. CB&I is the selected County consultant for professional <br />engineering services related to the Sector 3 Beach and Dune Restoration Project. <br />On March 14, 2017, the Board approved Work Order No. 15 to this contract for 2017 physical <br />monitoring services related to Sector 3 Beach and Dune Restoration Project. Work Order No. 15 <br />included lump sum services in the amount of $43,977.80. All work under Work Order No. 15 is <br />now 100% complete. The total amount of retainage withheld under Work Order No. 15 is <br />$4,397.78. <br />APTIM is requesting the release of all withheld retainage in the amount of $4,397.78. <br />FUNDING <br />Local funding of Beach Restoration includes a portion of Local Option Tourist Tax Revenue as well <br />as allocation of the One Cent Sales Tax. Funding for the release of retainage is from Account # <br />128-206005-05054. <br />C:\Users\legistar\AppData\Local\Temp\BCL Technologies\easyPDF 8\@BCL@800CB82C\@BCL@800CB82C.docx 90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.