Laserfiche WebLink
AAPTIM <br />Mr. lames Gray <br />December 8, 2017 <br />Page 12 of 12 <br />hardbottom to the post -construction conditions. The results of the hardbattom edge mapping survey shall also <br />be included in these reports with discussion of changes over time. <br />Task 10: Schedule <br />The immediate post -construction monitoring event will take place during the summer (May — September) <br />following project completion. Raw data from field operations will be submitted to the County and FDEP within 45 <br />days of completion of the survey and a monitoring report will be submitted within 90 days of completion of the <br />survey. <br />Task 10: Cost <br />The lump sum cost for Task 10 is $123,022.95. <br />Summary <br />Task 1. Design Update Post -Irma <br />Task 2: Hardbottom Edge Delineation <br />Task 3: Pians and Specifications <br />Task 4: ECL Establishment <br />Task 5: Pre -Construction Biological Monitoring <br />Task 6: Pre -Construction Services <br />Task 7: During Construction Services <br />Task 8; Beach Profile Check Surveys <br />Task 9: Project Completion Services <br />Task 10: Immediate Post -Construction Siological.Monitoring <br />The total lump sum cost of this proposal for Work Order #23 is <br />$ 4,398.00 <br />$10,763.00 <br />$14,959.00 <br />$9,916.65 <br />$147,166.60 <br />$15,187.65 <br />$73,831.00 <br />$ 7,904.65 <br />$11,942.30 <br />$123,022.95 <br />$419,091.80 <br />Thank you for the opportunity. to serve Indian River County. We look forward to continuing to provide successful <br />professional services to the County. Please do not hesitate to call if you have any questions. <br />Sincerely, <br />William Reilly, P.E. <br />Senior Coastal Engineer <br />Aptim Coastal Planning & Engineering, Inc. <br />Enclosure <br />cc: Thomas Pierro, P.E. D.CE, APTIM <br />Michelle Pfeiffer, P.E., APTIM <br />Stacy Buck, APTIM <br />David Swigier, P.E., APTIM <br />Debbie Neese, APTIM <br />WO#23: Sector 5 Permitting and Construction Services <br />F57VI rt') <br />Authorized Corporate Signature <br />`" )c,rvta.0 ?r i✓rr'o <br />Printed Name <br />Title <br />Proj_ #636232224 <br />110 <br />