My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-013
CBCC
>
Official Documents
>
2010's
>
2018
>
2018-013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 11:35:44 AM
Creation date
1/24/2018 1:11:17 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Authorization
Approved Date
01/23/2018
Control Number
2018-013
Agenda Item Number
8.H.
Entity Name
Blue Goose Construction
Subject
128th Court Water Main Extension
Work Authorization No. 2018-001
Area
128th Court
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK AUTHORIZATION DIRECTIVE <br />No. 2018-001 <br />128`" Court, 82"d Court, and 83'd Avenue Water Main Extension <br />BLUE GOOSE CONSTRUCTION <br />DATE OF ISSUANCE: January 9, 2018 EFFECTIVE DATE: January 23, 2018 <br />OWNER: Indian River County <br />CONTRACTOR: Blue Goose Construction <br />CONTRACT: WATER, SEWER AND RECLAIM WATER LINE REPLACEMENT / EXTENSIONS <br />AND MISCELLANEOUS LABOR CONTRACT, BID NO. 2015001, AWARDED September 9, 2014 <br />PROJECT: 128h Court, 82"d Court, and 83rd Avenue Water Main Extension <br />COUNTY UTILITY PROJECT NO.: UCP #N/A CONTRACTOR'S PROJECT NO.: N/A <br />COUNTY WIP. No. 472-169000-18504 <br />You are directed to proceed promptly with the following work: <br />Description: Connect to existing 12" water main along Roseland Road and extend 6" water main along <br />128`h Court, 82A Court, and 83rd Avenue. <br />Attachments: (none) <br />Method of determining Contract Price: <br />0 Unit Prices: Bid Items as established pursuant to Bid No. 2015001, and awarded by the Board of <br />County Commissioners on September 9, 2014 to Blue Goose Construction, Inc. <br />C Lump Sum <br />0 Cost of the Work <br />The Cost of Labor, Contingency and Contract Time is summarized below: <br />Labor Cost = <br />$35,634.06 <br />Estimated <br />120 days from NTP <br />Contract Time: <br />ACCEPT O: <br />By: { <br />Blue Goose Construction <br />Labor ontra or <br />Date: <br />I iy <br />RECOMM LADED: <br />By: <br />John M. qP.E. <br />Utilities <br />Date: <br />COUNTY, CHAIRII <br />Peter D. O'Bryan <br />APPROVED Aa <br />AND LEGAL SU <br />fa <br />O <br />4 <br />U <br />c <br />ro <br />I� <br />O <br />U <br />w <br />O <br />x <br />U <br />.H <br />E <br />U. <br />!15YLAN REINGOLD <br />COUNTY ATTORNEY <br />F:\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - 128th CT Water Main UCP 4142\Admin\Agenda Item\BGC WA <br />2018-001.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.