My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -El <br />PAGE 32 <br />GULF: The appropriate fuel recovery line loss multipliers to be used in calculating the <br />fuel cost recovery factors charged to each rate class/delivery voltage level class <br />are provided in response to Issue No. 22. <br />TECO: See Table 21-2 below: <br />Table 21-2 <br />TECO Fuel Recovery Line Loss Multipliers <br />for the period Januarv-December. 2018 <br />Voltage Level <br />Line Loss Multiplier <br />-Delivery <br />Distribution Secondary <br />1.00 <br />Distribution Primary <br />0.99 <br />Transmission <br />0.98 <br />Lighting Service <br />1.00 <br />Source: Schedule E1 -D, Page 5 of 30 (Exhibit PAR -3, Document 2) <br />ISSUE 22: What are the appropriate fuel cost recovery factors for each rate <br />class/delivery voltage level class adjusted for line losses? <br />STIPULATION: <br />The appropriate fuel cost recovery factors for each rate class/delivery voltage <br />level class adjusted for line losses are shown in Tables 22-1 through 22-11 below: <br />DEF: On August 29, 2017, Docket Number 20170183 -EI was opened to address the <br />Duke Energy Florida, LLC Petition for Limited Proceeding to Approve 2017 <br />Second Revised and Restated Stipulation and Settlement Agreement (2017 <br />RRSSA Petition). <br />If the 2017 RRSSA Petition is approved, the appropriate fuel cost recovery factors <br />for each rate class/delivery voltage level class adjusted for line losses are shown <br />in Table 22-1 below, and if the 2017 RRSSA Petition is not approved, the <br />appropriate fuel cost recovery factors shown in Table 22-1A below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.