My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -EI <br />PAGE 35 <br />Table 22-4 <br />FPL Fuel Cost Recovery Factors for the period March -December, 2018 <br />Source: Schedule E1 -E, Page 1 of 2 (Appendix III of Exhibit RBD -6) <br />Table 22-5 <br />FPL Fuel Cost Recovery Factors for the period March -December, 2018 <br />Fuel Recovery Factors - By Rate Group (Adjusted for Line Losses <br />Factors <br />From the 2018 SoBRA in-service date(projected to be March 1, <br />2018 through December 2018- <br />Group <br />Rate Schedule <br />Avg. <br />Factor <br />Loss <br />Multiplier <br />Fuel <br />Recovery <br />Factor <br />RS -1 first 1,000 kWh <br />2.630 <br />1.00206 <br />2.297 <br />A <br />RS -1, all addl. kWh <br />2.630 <br />1.00206 <br />3.297 <br />Rate Schedule <br />GS -1, SL -2, GSCU-1, WIES-1 <br />2.630 <br />1.00206 <br />2.635 <br />A-1 <br />SL -1, OL -1, PL -I" <br />2.534 <br />1.00206 <br />2.539 <br />B <br />GSD -1 <br />2.630 <br />1.00202 <br />2.635 <br />C <br />GSLD-1, CS -1 <br />2.630 <br />1.00150 <br />2.634 <br />D <br />GSLD-2, CS -2, OS -2, MET <br />2.630 <br />0.99635 <br />2.620 <br />E <br />GSLD-3, CS -3 <br />2.630 <br />0.97646 <br />2.568 <br />GSLD T -1 Off -Peak <br />GST -1 On -Peak <br />3.132 <br />1.00206 <br />3.138 <br />GSLD(T)-2 On -Peak <br />GST -1 Off Peak <br />2.420 <br />1.00206 <br />2.425 <br />A <br />RTR-1 On -Peak <br />- <br />- <br />0.503 <br />RTR-1 Off -Peak <br />- <br />- <br />0.210 <br />GSDT-1, CILC-1(G), HLFT-1 21-499 kW On Peak <br />3.132 <br />1.00202 <br />3.138 <br />B <br />GSDT-1, CILC-1 (G), HLFT-1 21-499 kW Off Peak <br />2.420 <br />1.00202 <br />2.425 <br />GSDLT-1, CST -1, HLFT-2 (500-1,9999 kW) On Peak <br />3.132 <br />1.00150 <br />3.137 <br />C <br />GSDLT-1, CST -1, HLFT-2 500-1,9999 kW Off Peak <br />2.420 <br />1.00150 <br />2.424 <br />GSDLT-2, CST -2, HLFT-3 2,000+ kW On Peak <br />3.132 <br />0.99672 <br />3.122 <br />D <br />GSDLT-2, CST -2, HLFT-3 2,000+ kW) Off Peak <br />2.420 <br />0.99672 <br />2.412 <br />GSDLT-3, CST -3, CILC-1 T , ISST-1 T On Peak <br />3.132 <br />0.97646 <br />3.058 <br />E <br />GSDLT-3, CST -3, CILC-1(T), ISST-1(T) Off Peak <br />2.420 <br />0.97646 <br />2.363 <br />CILC-1 (D), ISST-1 D On Peak <br />3.132 <br />0.99627 <br />3.120 <br />F <br />CILC-1 D , ISST-1(D) Off Peak <br />2.420 <br />0.99627 <br />2.411 <br />Source: Schedule E1 -E, Page 1 of 2 (Appendix III of Exhibit RBD -6) <br />Table 22-5 <br />FPL Fuel Cost Recovery Factors for the period March -December, 2018 <br />Source: Schedule El -E, Page 2 of 2 (Appendix III of Exhibit RBD -6) <br />18 Weighted Average 16% On -Peak and 84% Off -Peak <br />Seasonal Demand Time of Use Rider (SDTR) Fuel Recovery <br />Factors <br />For the Period June <br />- September, 2018 <br />Fuel <br />Avg. <br />Loss <br />Group <br />Rate Schedule <br />Recovery <br />Factor <br />Multiplier <br />Factor <br />GSD T -1 On -Peak <br />3.761 <br />1.00202 <br />3.769 <br />B <br />GSD T -1 Off -Peak <br />2.488 <br />1.00202 <br />2.493 <br />GSLD(T)-1 On -Peak <br />3.761 <br />1.00150 <br />3.767 <br />C <br />GSLD T -1 Off -Peak <br />2.488 <br />1.00150 <br />2.492 <br />GSLD(T)-2 On -Peak <br />3.761 <br />0.99672 <br />3.749 <br />D <br />GSLD T -2 Off -Peak <br />2.488 <br />0.99672 <br />2.480 <br />Source: Schedule El -E, Page 2 of 2 (Appendix III of Exhibit RBD -6) <br />18 Weighted Average 16% On -Peak and 84% Off -Peak <br />
The URL can be used to link to this page
Your browser does not support the video tag.