My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -EI <br />PAGE 3 8 <br />Table 22-11 <br />TECO Fuel Cost Recovery Factors for the period January -December, 2018 <br />Metering Voltage Level <br />Fuel Cost Recovery Factors cents per kWh <br />Levelized Fuel <br />Recovery Factor <br />First Tier <br />(Up to 1,000 <br />kWh) <br />Second Tier <br />(Over 1,000 <br />kWh) <br />STANDARD <br />Distribution Secondary (RS only) <br />2.818 3.818 <br />Distribution Secondary 3.132 <br />Distribution Primary 3.101 <br />Transmission 3.069 <br />Lighting Service 3.095 <br />TIME OF USE <br />Distribution Secondary- On -Peak 3.330 <br />Distribution Secondary- Off -Peak 3.047 <br />Distribution Primary- On -Peak 3.297 <br />Distribution Primary- Off -Peak 3.017 <br />Transmission — On -Peak 3.263 <br />Transmission — Off -Peak 2.986 <br />Source: Schedule E1 -E, Document Number 2, Page 6 of 30 (Exhibit PAR -3) <br />ISSUE 23A: Has DEF included in the capacity cost recovery clause the nuclear cost <br />recovery amount ordered by the Commission in Docket No. 170009 -EI? <br />STIPULATION: <br />On August 15, 2017, this Commission authorized DEF to include the nuclear cost <br />recovery amount of $49,648,457 in the calculation of its capacity cost recovery <br />factors for the period January through December, 2018 and DEF has appropriately <br />included this amount. If this Commission does not approve the 2017 Settlement, <br />the Levy project will be addressed as set forth in Commission Order No. PSC - <br />2017 -0341 -PCO -EI, dated August 30, 2017. <br />ISSUE 24A: Has FPL included in the capacity cost recovery clause the nuclear cost <br />recovery amount ordered by the Commission in Docket No. 20170009 -EI? <br />STIPULATION: <br />Yes. FPL included the nuclear cost recovery amount of $7,305,202, over - <br />recovery, in the calculation of its capacity cost recovery factors for the period <br />January through December 2018. In the event that this Commission determines at <br />the October 17, 2017 Special Agenda Conference for Docket 20170009 -EI that a <br />different amount is applicable, FPL will reflect the impact of that different <br />amount in the mid -course correction for the SJRPP transaction as described in <br />Issue 2R. Notwithstanding Rule 25-6.0423(6)(c)4, Florida Administrative Code, <br />
The URL can be used to link to this page
Your browser does not support the video tag.