Laserfiche WebLink
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -EI <br />PAGE 43 <br />Table 32-1 <br />FPL Jurisdictional Separation Factors <br />for the Deriod Januarv-December. 2018 <br />Demand <br />Separation Factor <br />Transmission <br />0.887974 <br />System Average Production Demand Base & Solar) <br />0.956652 <br />Contract Adjusted Demand — Intermediate <br />0.941431 <br />Contract Adjusted Demand — Peaking <br />0.947386 <br />Distribution <br />1.000000 <br />Source: Exhibit RBD -8 <br />GULF: The appropriate jurisdictional separation factors. are: <br />FPSC 97.18277% <br />FERC 2.81723% <br />TECO: The appropriate jurisdictional separation factor is 1.00. <br />ISSUE 33: What are the appropriate capacity cost recovery factors for the period <br />January 2018 through December 2018? <br />STIPULATION: <br />The appropriate capacity cost recovery factors for the period January 2018 <br />through December 2018 are shown in Tables 33-1 through 33-6 below. <br />DEF: On August 29, 2017, Docket Number 20170183 -EI was opened the address the <br />Duke Energy Florida, LLC Petition for Limited Proceeding to Approve 2017 <br />Second Revised and Restated Stipulation and Settlement Agreement (2017 <br />RRSSA Petition). <br />If the 2017 RRSSA Petition is approved, the appropriate capacity cost recovery <br />factors for the period January 2018 through December 2018 are shown in Table <br />33-1 below. <br />If the 2017 RRSSA Petition is not approved, the capacity cost recovery factors <br />beginning January 2018 will be the same as those listed in Table 33-1 pending the <br />outcome of the deferred Levy -portion of the 2017 NCRC hearing. <br />