My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -EI <br />PAGE 43 <br />Table 32-1 <br />FPL Jurisdictional Separation Factors <br />for the Deriod Januarv-December. 2018 <br />Demand <br />Separation Factor <br />Transmission <br />0.887974 <br />System Average Production Demand Base & Solar) <br />0.956652 <br />Contract Adjusted Demand — Intermediate <br />0.941431 <br />Contract Adjusted Demand — Peaking <br />0.947386 <br />Distribution <br />1.000000 <br />Source: Exhibit RBD -8 <br />GULF: The appropriate jurisdictional separation factors. are: <br />FPSC 97.18277% <br />FERC 2.81723% <br />TECO: The appropriate jurisdictional separation factor is 1.00. <br />ISSUE 33: What are the appropriate capacity cost recovery factors for the period <br />January 2018 through December 2018? <br />STIPULATION: <br />The appropriate capacity cost recovery factors for the period January 2018 <br />through December 2018 are shown in Tables 33-1 through 33-6 below. <br />DEF: On August 29, 2017, Docket Number 20170183 -EI was opened the address the <br />Duke Energy Florida, LLC Petition for Limited Proceeding to Approve 2017 <br />Second Revised and Restated Stipulation and Settlement Agreement (2017 <br />RRSSA Petition). <br />If the 2017 RRSSA Petition is approved, the appropriate capacity cost recovery <br />factors for the period January 2018 through December 2018 are shown in Table <br />33-1 below. <br />If the 2017 RRSSA Petition is not approved, the capacity cost recovery factors <br />beginning January 2018 will be the same as those listed in Table 33-1 pending the <br />outcome of the deferred Levy -portion of the 2017 NCRC hearing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.