My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/16/2018 (2)
CBCC
>
Meetings
>
2010's
>
2018
>
01/16/2018 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:17:48 PM
Creation date
2/14/2018 2:36:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
01/16/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -El <br />PAGE 45 <br />FPL: The appropriate capacity cost recovery factors for the period January 2018 <br />through December 2018 are shown in Tables 33-2 through 33-4 below: <br />Table 33-2 <br />FPL Capacity Cost Recovery Factors for the period January -December, 2018 <br />Rate Schedule <br />2018 <br />Capacity <br />Cost Recovery <br />Factors <br />$/kW <br />Reservation <br />Demand <br />$/kWh Charge <br />(RDC) <br />$/kW19 <br />Sum of Daily <br />Demand <br />Charge <br />(SDD) <br />$w20 <br />RS1/RTRl <br />- <br />0.00277 <br />- <br />- <br />GS 1/GST 1 <br />- <br />0.00259 <br />- <br />- <br />GSD1/GSDT1/HLFT1 <br />0.83 <br />- <br />- <br />- <br />OS2 <br />- <br />0.00114 <br />- <br />- <br />GSLD1/GSLDTI/CSI/CSTI/HLFT2 <br />0.98 <br />- <br />- <br />- <br />GSLD2/GSLDT2/CS2/CST2/HLFT3 <br />0.92 <br />- <br />- <br />- <br />GSLD3/GSLDT3/CS3/CST3 <br />0.95 <br />- <br />- <br />- <br />SST1T <br />- <br />- <br />$0.13 <br />$0.06 <br />SST1D1/SST1D2/SST1D3 <br />- <br />- <br />$0.13 <br />$0.06 <br />CILC D/CILC G <br />1.05 <br />- <br />- <br />- <br />CILC T <br />1.01 <br />- <br />- <br />- <br />MET <br />1.03 <br />- <br />- <br />- <br />OLl/SL1/SL1M/PL1 <br />- <br />0.00021 <br />- <br />- <br />SL2/SL2M/GSCU1 <br />- <br />0.00180 <br />- <br />- <br />Source: Page 20 of 29 (Appendix V of Exhibit RBD -8) <br />19RDC=((Total Capacity Costs )/(Projected Avg 12CP @gen)(.10)(demand loss expansion factor))/12 months <br />20SDD=((Total Capacity Costs )/(Projected Avg 12CP @gen)(21 on peak days)(demand loss expn. factor))/12 <br />months <br />
The URL can be used to link to this page
Your browser does not support the video tag.