Laserfiche WebLink
ORDER NO. PSC-2018-0028-FOF-EI ATTACHMENT A <br />DOCKET NO. 20180001 -El <br />PAGE 47 <br />GULF: The appropriate capacity cost recovery factors for the period January 2018 <br />through December 2018 are shown in Table 33-5 below: <br />Table 33-5 <br />GULF Capacity Cost Recovery Factors for the period January -December, 2018 <br />Rate Class Capacity Cost Recovery Factor <br />Cents / kWh Dollars / kW -month <br />RS, RSVP, RSTOU 0.835 <br />- <br />GS 0.762 <br />GSD, GSDT, GSTOU 0.666 <br />LP, LPT - <br />2.76 <br />PX, PXT, RTP, SBS 0.560 <br />- <br />OS-I/I1 0.164 <br />OSIII 0.505 <br />Source: Schedule CCE -2, Page 40 of 41 (Exhibit CSB -6) <br />TECO: The appropriate capacity cost recovery factors for the period January 2018 <br />through December 2018 are shown in Table 33-6 below: <br />Table 33-6 <br />TECO Capacity Cost Recovery Factors for the period January -December, 2018 <br />Rate Class and Metering Voltage Capacity Cost Recovery Factor <br />Cents / kWh Dollars / kW <br />RS Secondary 0.066 <br />_ <br />GS and CS Secondary 0.060 <br />GSD, SBF Standard <br />Secondary <br />- <br />0.20 <br />Prima <br />0.20 <br />Transmission <br />0.20 <br />GSD Optional <br />Secondary <br />0.047 <br />_ <br />Primary <br />0.047 <br />IS, SBI <br />Prima <br />_ <br />0.14 <br />Transmission <br />0.14 <br />LS 1 Secondary <br />0.016 <br />- <br />Source: Document Number 1, Page 3 of 4 (Exhibit PAR -3) <br />