My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02/06/2018
CBCC
>
Meetings
>
2010's
>
2018
>
02/06/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/11/2021 12:30:01 PM
Creation date
2/16/2018 10:53:51 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
02/06/2018
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section III — Contract Documents <br />7. Following agency approvals (Florida Department of Environmental Protection, St. Johns <br />River Water Management District, Florida Department of Transportation, Army Corp of <br />Engineers, and Indian River County), KMA will finalize plans and specifications in bid ready <br />format to obtain bids from contractors to permit the work. <br />8. KMA will provide review and summary of contractors' proposals for work to Indian River <br />County Utility Department and support decision for selection of contractor(s). <br />Section IV - Inspection <br />9. KMA will provide periodic inspections of work to ensure compliance with plans and permits. <br />Section V - Reim bursableslAdditional Work <br />We have significant survey, environmental and soils information, however, if it is found to be <br />inadequate to prepare plans or address comments, any additional survey, soils or <br />environmental consultation studies or field work will be coordinated with client to obtain on most <br />reasonable time and cost basis for Indian River County. Permit application fees will be paid <br />direct by the county. <br />Section VI — Deliverables <br />10. 3 Signed sealed copies of construction plans <br />11. Word document of the technical specifications <br />12. Electronic copies (AutoCAD of the construction plans) <br />Payment <br />For performing the above scope of work, KMA will be compensated by payment of the following <br />estimated amounts: <br />Section Description <br />I Submittal <br />II Approval <br />III Construction Documents <br />1V Inspections <br />Agreement <br />Estimated Amount <br />$12,500 <br />$10,000 Time & Materials <br />$ 3,000 <br />$ 3,000 <br />NTP Time Schedule <br />60 days <br />120 days <br />30 days <br />30 days <br />If the general scope of work, and payment schedule are consistent with your needs a signed <br />copy of this proposal will be considered authorization to proceed. This proposal is not complete <br />without Standard Provisions sheet attached. <br />—V�� <br />Knight, McGuire & Associates, Inc. Indian River County <br />David S. Knight, P.E., C.E.O. Authorized Representative <br />Attached: Standard Provisions <br />\miscprop\spoonbill berm main ircud 012518 <br />111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.