Laserfiche WebLink
ATTA <br />GRANT <br />PROJECT TITLE: Wabasso (Indian River <br />PROJECT LOCATION: The Project is locat <br />(Department/DEP) reference monuments R20 and <br />Florida. <br />PROJECT BACKGROUND: The Wabasso (Ind <br />restoration of approximately 6.1 miles of shoreline <br />section) in Indian River County (Sector 3). Const <br />construction was completed in 2012, as authoriz <br />damages sustained during Hurricane Sandy, emerl <br />project was constructed in the winter of 2014 - 2 <br />constructed in accordance with the terms and con <br />additional post -construction hardbottom monitori: <br />Department staff is currently reviewing the 2011 <br />mitigation of an estimated 1.5 acres of hardbottorr <br />PROJECT DESCRIPTION: The Project <br />PROJECT ELIGIBILITY: The Department ha <br />cost is eligible for state cost sharing. Therefore, tl <br />sum of $900,000 for this Project or up to 50 perc <br />specific eligible Project items listed, whichever is <br />estimate and shall not affect the cost sharing peri <br />eligibility for cost sharing purposes will be maint, <br />BENT 3 <br />RK PLAN <br />3) Beach Restoration. <br />between Department of Environmental Protection <br />1.3 along the Atlantic Ocean in Indian River County, <br />m River Sector 3) Beach Restoration project consists of <br />etween DEP Monuments R20 - R51.3 (critically eroded <br />action of Phase I was completed in 2010 and Phase II <br />J under JCP Permit number 0285993-0014C. Due to <br />;ncy repairs were added in 2012 and a full storm repair <br />15 under JCP Permit number 0285993 -008 -JC. It was <br />lions of the permit, however, the Department required <br />during 2016. Although the permit has since expired, <br />hardbottom monitoring report to assess the need for <br />Construction is anticipated for FY 2018-19. <br />of design and construction of a mitigation reef. <br />determined that 100 percent of the non-federal Project <br />Department's financial obligation shall not exceed the <br />nt of the non-federal Project cost, if applicable, for the <br />ass. Any indicated federal cost sharing percentage is an <br />wages of the non-federal share. The parties agree that <br />ned pursuant to 6213-36, F.A.C. <br />The Grantee will be responsible for auditing all #avel reimbursement expenses based on the travel limits <br />established in Section 112.061, Florida Statutes (FF.S.). <br />Pursuant to Sections 161.091 - 161.161, F.S, <br />governmental entities for beach erosion control <br />Management Funding Assistance Program. <br />Pursuant to 62B -36.005(1)(d), Florida Admini; <br />and serve as local sponsor, has demonstrated a <br />perform the tasks associated with the beach erc <br />The Project shall be conducted in accordance <br />all applicable Department permits and the elig <br />and processing, and the resulting product d <br />specifications contained in the Department's <br />(2014) and all associated state and federal pE <br />Work for an eligible Project item. The monito <br />Department provides financial assistance to eligible <br />inlet management activities under the Florida Beach <br />ve Code (F.A.C.), the Grantee has resolved to support <br />ncial commitment, and has demonstrated the ability to <br />control project as described herein. <br />the terms and conditions set forth under this Agreement, <br />Project task items established below. All data collection <br />rables, shall comply with the standards and technical <br />nitoring Standards for Beach Erosion Control Projects <br />:s, unless otherwise specified in the approved Scope of <br />standards may be found at: <br />DEP Agreement No. 17IR1, Attachment 3, Page I of 3 <br />